Laserfiche WebLink
. CITY OF SOUTH BEND <br />1999 CAPITAL BUDGET -DETAIL LISTING OF CAPITAL EXPENDITURES <br /> ESTIMATED <br /> COST <br />Roof inspection and repair 30,000 <br />Total Buildings and Building Improvements for Sewage Works 130,000 <br />MOTOR VEHICLES: <br />Sewer Department: <br />Twin-axel Dump Trucks (2) -replaces 1988 model 164,000 <br />Single-axel Dump Truck (1) -replaces 1980 model 72,000 <br />Wastewater: <br />Screen Machine (1) -Organic Resources -new 200,000 <br />Loader (1) -Organic Resources -replaces 1982 model 220,000 <br />Boom Truck (1) -Wastewater- replaces 1986 model 80,000 <br />11 Yard Rolloff Boxes (4) 17,500 <br />Total Motor Vehicles for Sewage Works 753,500 <br />COMPUTER EQUIPMENT 8 NETWORKING: <br />Stormwater Mgt Program & GIS costs -one-time cost of $75,000 plus $125,000tyear 200,000 <br />Wastewater: <br />486 Desktop computer replacements w/ monitors (12) 12,000 <br />Printer replacemenUaddition 2,000 <br />Total Computer Equipment and Networking for Sewage Works 214,000 <br />MATERIALS AND EQUIPMENT: <br />Sewer Department: <br />Sewer equipment (upgrades to Vador, other equipment upgrade) 10,000 <br />Wastewater: <br />Clarifier Faulk drive replacement 150,000 <br />Scum Handling equipment 80,000 <br />Dewatering Control 50,000 <br />Waste Gas Burner 10,000 <br />Pump replacements 50,000 <br />Total Materials and Equipment for Sewage Works 350,000 <br />- 19-Jan-99 <br />ADDITIONAL <br />COMMENTS <br />TOTAL SEWAGE WORKS CAPITAL BUDGET 5,152,500 <br />COLLEGE FOOTBALL HALL OF FAME: <br />MATERIALS AND EQUIPMENT: <br />Replacement of 6 CRTs of 7200 Series AMPRO Projectors 30,000 <br />Power conditioning (display back-up power): <br />Stadium Theater (1) 10,000 <br />Football Kiosks (2) 4,000 <br />Zip Drives for Kiosks 1,000 <br />Transpak -Stadium Theater (slide projector sequence control) - 2 3,000 <br />Back-up Slide Projectors (ECHO) - 2 1,500 <br />Replacement of selected interadives in Training Center 20,000 <br />Total Materials and Equipment for HOF 69,500 <br />TOTAL COLLEGE FOOTBALL HALL OF FAME CAPITAL BUDGET 69,500 <br />