My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.A.(1) Agency Agreement
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2009
>
04/17/09 Meeting
>
6.A.(1) Agency Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 12:24:13 PM
Creation date
4/14/2009 4:04:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Gears <br />ONSTRUCTION CO. <br />1923 N. HOME ST. MISHAWAKA, INDIANA 46545-7287 <br />PHONE:(574)255-9671 FAX:(574)255-8965 www.llgeans.com <br />Building your trust with solid service. <br />March 18, 2009 <br />The Morris Performing Arts Center <br />David R. Davenport <br />211 North Michigan Street <br />South Bend, IN 46601-9729 <br />PROPOSAL: 09-0055 <br />Phone: <br />Fax: <br />Project Location: <br />574-245-6074 <br />574-235-9729 <br />Same <br />We propose to furnish all labor, material and equipment to complete the following: <br />Decorative Concrete in area to the north side of existing decorative concrete as follows: <br />1. Total area approximately 588 square feet. <br />2. Remove and haul off existing brick. <br />3. Install 3/8" rebar dowels around perimeter of new concrete 2' on center. <br />4. Provide and install Decorative Stamped Concrete to match adjoining decorative concrete to the <br />south. Due to the nature of concrete aging and color variations the new decorative will not be an <br />exact match in color to the existing decorative concrete. <br />5. Clean and apply sealer upon completion. <br />Furnish material and labor -complete in accordance with the above specification for the sum of: $7,985.00 <br />Note: This proposal may be withdrawn by us if not accepted within 30 days. <br />Authorized Signature: <br />oc .Gears, President <br />IMPORTANT ADDITIONAL TERMS ON BACK. READ BEFORE S NING. <br />The above contract terms are accepted, and L.L. Gears Construction Co. is authorized to do the work as specified above. <br />Date of Acceptance: Signature: <br />Sign and Return Via Fax or Mail Printed Name: <br />Please provide the following information about the project location for utility locating purposes: <br />Township: <br />Subdivision: <br />
The URL can be used to link to this page
Your browser does not support the video tag.