My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.A.(1) Agency Agreement
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2009
>
04/17/09 Meeting
>
6.A.(1) Agency Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 12:24:13 PM
Creation date
4/14/2009 4:04:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER-OFFICE <br />MEMORANDUM <br />T0: Jeff Gibney <br />Executive Director of Community & Economic Development <br />FROM: Dennis ,J. Andres Q~p~-~-' <br />DATE: February 10, 2009 <br />SUBJECT: REPAIR & UPGRADES to the .TON HUNT PLAZA /PARK AND FOUNTAIN <br />As the Jon Hunt Plaza /Park and Fountain are owned by the Redevelopment Authority; I am <br />requesting the Redevelopment Commission to consider providing the necessary funding t.o <br />make needed repairs and suggested upgrades to the Jon Hunt Plaza /Park and Fountain. <br />The Fountain is in dire need of restoration and repair to maintain a sound structure and <br />protect. the investment made to date. In its current condition, the fountain looses tens of <br />thousands of water daily ... it leaks like a sieve. Badly deteriorating sealant. in all joints needs <br />to be removed and replaced. The existing fountain decorative lighting fixtures need to be <br />reseated and re-sealed. Covers over 16 abandoned portholes from years ago need to be reseated <br />and re-sealed. Approximately 33 if of limestone caps on upper west side of the fountain are <br />badly cracked /split and need to be replaced. And finally, the west section of the moat around <br />the fountain needs to be cleaned, patched, caulked and then waterproofed. <br />• Low quote for the aforementioned repairs was approximately 8 500 (see attached.) <br />The Fountain is operational fi•om May 1 through September 30 each year. During this time <br />period, it has been necessary to service the Fountain daily at a total labor cost of <br />approximately $2,500. The cost for necessary water treatment per summer is approximately <br />X7,500. It has been suggested that this total annual summer cost of $10,000 might be able to <br />be cut by as much as 3/4 if the necessary repairs, as noted above, are executed AND a debris <br />catcher is installed around the fountain in the moat. The lack of a debris catcher is directly <br />related to the current. daily fountain maintenance expense. The lose of water due to the <br />fountain leaks is directly proportional to the water treatment cost. <br />• Stainless steel perforated panels installed in the fountain moat on all three sides to <br />serve as a debris catcher would cost approximately 15 000 (see quote attached). <br />Continuing with Plaza repairs, we would like to complete a project that was begun several <br />years ago. The Plaza surface is composed of red brick laid on the ground. The main brick <br />surface is believed to be in decent shape however, the upper portion (walkway along Michigan <br />PERF®18MING ARTS CENTER SOUTH BEND, IN <br />
The URL can be used to link to this page
Your browser does not support the video tag.