Laserfiche WebLink
REGULAR MEETING <br />3, <br />Green Toyota Tercel <br />1993 <br />$ <br />100.00 <br />4, <br />Gray Chevrolet Cavalier <br />1993 <br />$ <br />100.00 <br />5. <br />White Pontiac Bonneville <br />1992 <br />$ <br />100.00 <br />6® <br />— Red Ford Probe <br />1992 <br />S <br />150.00 <br />7, <br />Gray Saturn 4-Dr. <br />1993 <br />$ <br />130.00 <br />8. <br />gray Hyundai Elantra <br />L 994 <br />$ <br />120.00 <br />9® <br />Black Honda CRX <br />1988 <br />200 ®0 <br />10 <br />— Blue/Wood Buick Century <br />1993 <br />100.00 <br />11 - <br />- �Burgundy _Dodge Stratus <br />1995 <br />$ <br />130.00 <br />11 <br />_ Purple Ford Escort <br />1997 <br />$ <br />100.00 <br />13® <br />Blue Dodge Neon <br />1995 <br />$ <br />75800 <br />14. <br />— Blue Chevrolet C1500 <br />1993 <br />$ <br />125.00 <br />15. <br />White Chevrolet G20 Van <br />1995 <br />$ <br />100.00 <br />16. _ <br />White Ford Econoline <br />1993 <br />$ <br />100.00 <br />Upon a motion made by Mr. Gilot, seconded by Mr. Inks and carried, the above bids were <br />referred to Code Enforcement for review and recommendation. <br />After reviewing those bids, Ms. Kathy Eli, Code Enforcement, recommended that the Board <br />award the contract to the highest responsive and responsible bidders as shown in bold above. <br />Therefore, Mr. Gilot made a motion that the recommendation be accepted and the bids be <br />awarded as outlined above. Mr. Inks seconded the motion, which carried. <br />OPENING OF QUOTATIONS — 500 BLOCK SOUTH MICHIGAN STREET - FAT DADDY'S <br />BLOCK CLEAN-UP AND RE-BOA MING - PROJECT NO. 108-076, (DOWNTOWN TIF) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The Clerk of the Board stated there were no quotations received. <br />.APPROVE CHANGE ORDER NO. 9 - EDDY/COLFAX & EDDY/LASALL <br />RECONSTRUCTION - PROJECT NO. 104-033 (FHWA &INDOT) <br />Mr. Gilot advised that Ms. Thia Vawter, Engineering, has submitted Change Order No. 9 <br />behalf of Brooks Construction Company, Inc., 1810 US Highway 20, Goshen, Indiana 46521 <br />