My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04122016 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2016
>
04122016 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:45:54 PM
Creation date
4/27/2016 10:02:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/12/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />APRILI2, 2016 128 <br />ALTERNATF. #1 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Remove & replace roof of <br />Amount <br />21 <br />Leighton Plaza Stair Tower 1 as <br />necessary to replace elevator <br />1 <br />LS <br />NO BID <br />NO BID <br />machine. <br />ALTERNATE#1TOTAL <br />ALTERNATF. #2 <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Remove &replace roof of <br />Amount <br />22 <br />Leighton Plaza Stair Tower 2 as <br />necessary to replace elevator <br />1 <br />LS <br />NO BID <br />NO BID <br />machine. <br />ALTERNATE #2 TOTAL <br />ALTERNATE #3 <br />Fit —elm Deseri lion Total <br />No. P Quantity Unit Unit Price <br />NEMA 1 elevator and electrical <br />AMOURt <br />23 <br />fixtures in Wayne Street Southeast <br />I <br />LS <br />($38,875) <br />($38,875) <br />Tower <br />ALTERNATE 43 TOTAL 1 ($38,875) <br />ALTERNATF. #4 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />NEMA 1 elevator and electrical <br />24 <br />fixtures in Wayne Street <br />Northwest Tower <br />1 <br />LS <br />($38,875) <br />($38,875) <br />ALTERNATF, 94 TOTAL <br />($38,875) <br />ALTERNATF. #5 <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />NEMA 1 elevator and electrical <br />25 <br />fixtures in Leighton Plaza Stair <br />1 <br />LS <br />($37,632) <br />($37,632) <br />Tower 1 <br />ALTERNATE #5 TOTAL ($37,632) <br />ALTERNATE #6 <br />Item <br />A'o <br />Description <br />P <br />Quantity <br />Unit <br />Unit Price <br />Total <br />Amount <br />NEMA I elevator and electrical <br />26 <br />fixtures in Leighton Plaza Stair <br />I <br />LS <br />($37,632) <br />($37,632) <br />Tower 2 <br />ALTERNATE #6 TOTAL ($37,632) <br />Upon a motion made by Mr. Relos, seconded by Ms. Maradik and carried, the above bid was <br />referred to Engineering and Community Investment for review and recommendation. <br />OPENING OF QUOTATIONS — REMOVAL AND REPLACEMENT OF TWO (2) ABOVF <br />GROUND IiOISTS FOR CENTRAL SERVICES (CENTRAL SERVICES CAPITAL) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotation was opened and read: <br />RIDGE NAPA SOUTH BEND <br />3135 South Main Street <br />
The URL can be used to link to this page
Your browser does not support the video tag.