Laserfiche WebLink
(h). During construction of the public portions of the water and sewer Extension <br />located on the Site and until dedication to the City in accordance with the <br />terms of this Agreement, carry and maintain comprehensive general liability <br />and casualty insurance with regard to bodily injury, sickness, disease or death, <br />and damage to or, destruction of tangible property, including the loss of use <br />resulting therefrom, for which the Band Parties may be liable, including, but <br />not limited to damages, costs, claims, and expenses arising from or directly <br />related to the public portions of the water and sewer Extension located on the <br />Site. Such insurance shall, at a minimum, be in amounts equal to cover the <br />repair and full replacement of the public portion of either the Initial Phase or <br />the Full Build -Out Phase of the water and sewer Extension located on the Site, <br />depending on which phase is being constructed. <br />6. City_ Obligations. The City shall fulfill the following obligations regarding water <br />system services and sewer system services and improvements: <br />(a). Review and approve in a timely and expeditious manner pursuant to <br />applicable law and regulation and in accordance with the City's standards and <br />specifications all design plans submitted by a Band Party to the City regarding <br />upgrades and extensions of the water system and sewer system, and any <br />approvals and permits required from the City shall not be unreasonably <br />withheld. <br />(b). Conduct 'inspections and testing during construction of the Initial Phase and <br />Full Build -Out Phase improvements. The inspections and testing will be done <br />as necessary in order to ensure compliance with the design, plans and the <br />City's standards and specifications. The Band Parties and the City shall <br />endeavor in good faith to reach agreement regarding the selection of a <br />qualified firm to conduct the inspections and testing, which will be done at the <br />Band Parties' expense. <br />(c). Within six (6) months prior to dedication of the Initial Phase and Full Build - <br />Out Phase improvements from the Band Parties to the City, a final inspection <br />will be conducted by the City at the City's expense. The City shall provide a <br />copy of the results of such inspection along with a list of defects, if any, the <br />Band Parties must rectify prior to dedicating the improvements to the City. <br />Any defects reported shall be repaired by the Band Parties at their sole <br />expense prior to dedication. <br />(d). Provide water services and sewer services to the Site and all current and future <br />Site Customers in the full capacities of the systems. <br />