Laserfiche WebLink
REGULAR MEETING NOVEMBER 10, 2015 386 <br />be accepted and the quotation be awarded as outlined above. Mr. Roles seconded the motion, <br />which carried. <br />AWARD BID — ONE OR MORE 2015 OR NEWER CNG QUAD AXLE DUMP TRUCK <br />(ORGANIC RESOURCES CAPITAL) <br />Mr. Jeff Hudak, Central Services, advised the Board that on October 27, 2015, bids were <br />received and opened for the above referenced vehicle. After reviewing those bids, Mr. Hudak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Hill Truck Sales, Inc., 1011 W. Sample St., South Bend, Indiana 46624, in the unit amount of <br />$203,845.00. Therefore, Mr. Relos made a motion that the recommendation be accepted and the <br />bid be awarded as outlined above. Ms. Maradik seconded the motion, which carried. <br />AWARD BID AND APPROVE CONTRACT — EQUIPMENT PURCHASE FOR NEI I O <br />CORPORATION, PHASE V — PROJECT NO 115-114 (RWDA TIF <br />Mr. Michael Carey, Engineering, advised the Board that on October 13, 2015, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Carey <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Hull Lift Truck, 28747 Old US 33 West, Elkhart, Indiana 46516, in the amount of $42,952,67. <br />Therefore, Mr. Robs made a motion that the recommendation be accepted and the bid be <br />awarded and the contract approved as outlined above. Ms. Maradik seconded the motion, which <br />carried. <br />In a memorandum to the Board, Mr. Jeff Hudak, Central Services, requested permission to reject <br />the one (1) bid received for the above referenced vehicle because it did not meet the Engineering <br />Department's needs. Therefore, upon a motion made by Mr. Relos, seconded by Ms. Maradik <br />and carried, the above request was approved. <br />AWARD QUOTATION — FIRE DEPARTMENT HOSE (FIRE DEPARTMENT EQUIPMENT <br />REPAIRS/MALN 1 ENANCF) _ <br />Assistant Chief John Corthier, Fire Department, advised the Board that on October 27, 2015, <br />quotations were received and opened for the above referenced equipment. In a Memo to the <br />Board, Chief Corthier stated although Hoosier Fire Equipment was not the lowest bidder, they <br />were the lowest, responsive and responsible bidder, meeting the specifications for each item <br />requested. Chief Corthier explained that the supply hose requested for Item No. 3 is a three (3) <br />Ply hose, met only by Hoosier. Be noted the longevity and performance of this hose makes it <br />such that the South Bend Fire Department is unwilling to compromise on this specification, and <br />this quote is not divisible. Therefore, Chief Corthier recommended that the Board award the <br />contract to the most responsive and responsible quoter, Hoosier Fire Equipment, Inc., 4009 <br />Montdale Park Drive, Valparaiso, Indiana, in unit prices as bid. Therefore, Mr. Relos made a <br />motion that the recommendation be accepted and the quotation be awarded as outlined above. <br />Ms. Maradik seconded the motion, which carried. <br />APPROVAL OF REQUEST TO REJECT OUOTFS SUPPLY AND INSTALL FOUR STEP <br />ASPHALT ROOFING SYSTEM FOR CENTRAL SERVICES DIVISION (CAPITAL) <br />In a memorandum to the Board, Mr. Matt Chlebowski, Central Services, requested permission to <br />reject all quotes received for the above referenced project because all quotes received were over <br />the City's threshold for quotes. Mr. Chlebowski stated he will bid the project. Therefore, upon a <br />motion made by Mr. Relos, seconded by Ms. Maradik and carried, the above request was <br />approved. <br />APPROVE CHANGE ORDER NO. 2 — FAST GATE LIFT STATION REPLACEMENT <br />PROJECT NO. 114-054 (ENVIRONMENTAL SERVICES) <br />Mr. Gilot advised that Mr. Jacob Klosinski, Environmental Services, has submitted Change <br />Order No. 2 on behalf of Selge Construction Company, Inc., 2833 South 11" Street, Niles, <br />Michigan 49120, indicating the Contract amount be decreased by $15,830.85 for a new Contract <br />sum, including this Change Order, in the amount of $574,511.70. Upon a motion made by Mr. <br />Relos, seconded by Ms. Maradik and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 2 — WESTERN AVENUE CORRIDOR IMPROVEMENTS <br />— PROJECT NO 114-033B (MAJOR MOVES/RWDA TIF) <br />