Laserfiche WebLink
(2) Single-Use Residential $20* <br /> (3) Other $50* <br /> *Downspout/Drain Disconnection Fee shall be waived until January 1, 2018 <br /> b. Drainage Review (Required of all non-single-use residential) $150 <br /> c. Utility Verification Fee $50 <br /> Section II. Chapter 6, Article 5, Section 6-11 of the South Bend Municipal Code shall be <br /> amended to read in its entirety as follows: <br /> Sec. 6-11 Permit requirements <br /> cal All temporary occupancy of public property as hereinafter provided for shall be <br /> considered and treated as being at the will of the City, and will be permitted only by <br /> special permit issued by the City Engineer as defined in Chapter 18, Article 7 of the <br /> South Bend Municipal Code. <br /> Public Works and Safety a bond of with proper securities approved by the Controller, in <br /> us its . _ .' '. . _. . •-- --- -•. -- --- --- - . <br /> . .. <br /> put to, from or by reason of any act or thing done or neglected to be done, or by virtue of <br /> the authority given in such permit. <br /> Such a permit will be for temporary occupancy of the street or streets immediately in <br /> front of the contemplated building or structure for the building operations as herein <br /> described and for administration purposes. <br /> (c) The fee for granting such a permit shall be twenty dollars ($20.00) <br /> (c) (e)The occupancy of a street for the purposes permitted in the permit shall never extend <br /> in front of any one (1)building to exceed one-third of the width of the roadway, unless a <br /> greater width is permitted by the Board of Public Works, and in no event is any material <br /> to be stored or placed closer than four (4) feet of any railway track. In all cases where <br /> such obstruction of the street is made there shall be a clear space of not less than one (1) <br /> foot between such obstruction and the curb line, which may be arched over at a height <br /> sufficient to permit drainage of water in the gutter. <br /> (d) (ft A suitably surfaced walk, four (4) feet wide, for the use of pedestrians shall be <br /> maintained between the building line and the curb line, except as provided in section 6- <br /> 12. <br /> �) (g)Earth taken from the excavation and rubbish taken from the building shall not be <br /> stored upon the sidewalk or roadway of the street. <br /> 2 <br />