My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-23-15 Agenda, Packet & Committee Meeting Notice
sbend
>
Public
>
Common Council
>
Committee Meeting Notices
>
2015
>
11-23-15 Agenda, Packet & Committee Meeting Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2015 3:08:03 PM
Creation date
11/19/2015 11:56:58 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Agendas
City Counci - Date
11/23/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(C) New construction and substantial improvements shall be constructed with <br /> materials and utility equipment resistant to flood damage below the FPG; <br /> (D) New construction and substantial improvements shall be constructed by <br /> methods and practices that minimize flood damage; <br /> (E) Electrical, heating, ventilation, plumbing, air conditioning equipment, utility <br /> meters, and other service facilities shall be located at/above the FPG or <br /> designed so as to prevent water from entering or accumulating within the <br /> components below the FPG. Water and sewer pipes, electrical and telephone <br /> lines, submersible pumps, and other waterproofed service facilities may be <br /> located below the FPG; <br /> (F) New and replacement water supply systems shall be designed to minimize or <br /> eliminate infiltration of flood waters into the system; <br /> (G) New and replacement sanitary sewage systems shall be designed to minimize <br /> or eliminate infiltration of flood waters into the system; <br /> (H) On-site waste disposal systems shall be located and constructed to avoid <br /> impairment to them or contamination from them during flooding; <br /> (I) Any alteration,repair, reconstruction or improvements to a structure that is in <br /> compliance with the provisions of this Article shall meet the requirements of <br /> "new construction"as contained in this Article; <br /> (J) Whenever any portion of the SFHA is authorized for use, the volume of space <br /> which will be occupied by the authorized fill or structure below the BFE shall <br /> be compensated for and balanced by an equivalent volume of excavation <br /> taken below the BFE. The excavation volume shall be at least equal to the <br /> volume of storage lost (replacement ratio of 1 to 1)due to the fill or structure. <br /> i. The excavation shall take place in the floodplain and in the same <br /> property in which the authorized fill or structure is located; <br /> ii. Under certain circumstances,the excavation may be allowed to take <br /> place outside of but adjacent to the floodplain provided that the <br /> excavated volume will be below the regulatory flood elevation, will be <br /> in the same property in which the authorized fill or structure is located, <br /> will be accessible to the regulatory flood water,will not be subject to <br /> ponding when not inundated by flood water,and that it shall not be <br /> refilled; <br /> iii. The excavation shall provide for true storage of floodwater but shall not <br /> be subject to ponding when not inundated by flood water; <br />
The URL can be used to link to this page
Your browser does not support the video tag.