Laserfiche WebLink
Sec. 18-61. Conditions of any barricade permit <br /> (a) Indemnity: No permit shall be granted unless the applicant shall have undertaken to <br /> indemnify and save harmless the City of South Bend of and from any and all losses or <br /> claims which may be asserted by anyone by reason of the granting of such permit and <br /> the occupancy of the right-of-way by the applicant. <br /> (b) Restoration: The applicant shall covenant to restore the right-of-way to a like or better <br /> condition than existed prior to the permitted use upon conclusion of the approved <br /> occupancy. <br /> (c) Barricades and Signs: All barricades and signs shall conform to the latest revision of <br /> the Indiana Manual on Uniform Traffic Control Devices as well as any additional <br /> requirements deemed appropriate by the Department of Public Works or Police <br /> Department when necessitated by special or additional safety considerations. <br /> Permittees shall bear the expense of obtaining, erecting, maintaining and removing <br /> barricades and signs. Applicant shall also designate a representative by name and 24- <br /> hour phone number for notification by City when maintenance of barricading is <br /> required. <br /> (d) Barricade Fee Schedule: Permit fees shall not be waived. The term "week" is defined <br /> as a period from 1 to 7 days. <br /> Type Street Complete Closure Traffic Lane Restrictions Non-Traffic <br /> Restrictions <br /> Local $75 /week $35/week $20/week <br /> Collector $50/day/lane $50/day/lane $35/week <br /> Arterial $75/day/lane $75/day/lane $35/week <br /> If a fee is paid to obstruct a portion of the roadway and if the right-of-way adjacent to the <br /> road will be obstructed for the same duration of time as the roadway, an additional charge <br /> will not be assessed for the area adjacent to the roadway. <br /> (e) Penalty for Violation: Any person who fails to obtain the necessary right-of-way <br /> occupancy permit shall be shall be fined not less than one hundred dollars ($100.00) <br /> per day nor more than one thousand($1,000.00)per day, until such time as an approved <br /> permit is obtained, in addition to being liable for the appropriate fee from the date said <br /> occupancy began. Enforcement proceedings may be initiated upon complaint by the <br /> Department of Public Works or by any affected individual. <br /> Sec. 18-62. Bond required; amount; conditions; indemnification; insurance. <br /> (a) At the time of making the request under section 18-60 the person desiring to obtain an <br /> occupancy permit shall file a bond payable to the City in such sum as the Board of Public <br /> Works may designate. The bond shall be filed with the Board of Public Works and shall be <br /> conditioned to save the City harmless from any loss, cost or damage by reason of such <br /> 9 <br />