My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-15 Agenda, Packet & Committee Meeting Notice
sbend
>
Public
>
Common Council
>
Committee Meeting Notices
>
2015
>
11-09-15 Agenda, Packet & Committee Meeting Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2015 11:57:41 AM
Creation date
11/5/2015 11:57:04 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Agendas
City Counci - Date
11/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
iii. A legal description of the property site; <br /> iv. A site development plan showing existing and proposed development <br /> locations and existing and proposed land grades; <br /> v. Elevation of the top of the lowest floor(including basement) of all <br /> proposed buildings. Elevation should be in NAVD 88 or NGVD; <br /> vi. Elevation (in NAVD 88 or NGVD) to which any non-residential <br /> structure will be floodproofed; and <br /> vii. Description of the extent to which any watercourse will be altered or <br /> relocated as a result of proposed development. A hydrologic and <br /> hydraulic engineering study is required and any watercourse changes <br /> submitted to DNR for approval and then to FEMA as a Letter of Map <br /> Revision. (See Section 21-12.04 (3) (F) for additional information). <br /> (B) Construction Stage. Upon establishment of the floodproofed elevation of a <br /> floodproofed structure, it shall be the duty of the applicant to submit to the <br /> Floodplain Administrator a floodproofing certificate. Certification shall be <br /> prepared by or under the direct supervision of a registered professional <br /> engineer and certified by same (The Floodplain Administrator shall review the <br /> floodproofing certification submitted). The applicant shall correct any <br /> deficiencies detected by such review before any further work is allowed to <br /> proceed. Failure to submit the floodproofing certification or failure to make <br /> correction required shall be cause to issue a stop-work order for the project. <br /> (C) Finished Construction. Upon completion of construction, an elevation <br /> certification(FEMA Elevation Certificate Form 81-31 or any future updates) <br /> which depicts the"as-built" lowest floor elevation is required to be submitted <br /> to the Floodplain Administrator. If the project includes a floodproofing <br /> measure, floodproofing certification(FEMA Floodproofing Certificate Form <br /> 81-65 or any future updates) is required to be submitted by the applicant to the <br /> Floodplain Administrator. <br /> (3) Duties and Responsibilities of the Floodplain Administrator <br /> The Floodplain Administrator and/or designated staff is hereby authorized and <br /> directed to enforce the provisions of this Article. The administrator is further <br /> authorized to render interpretations of this Article, which are consistent with its <br /> spirit and purpose. <br /> Duties and Responsibilities of the Floodplain Administrator shall include, but not <br /> be limited to: <br />
The URL can be used to link to this page
Your browser does not support the video tag.