Laserfiche WebLink
a. Cost per Square Foot (CSF) times the Total Square Footage (TSF) times the Local <br /> Variable Factor (LVF) of$0.00098. <br /> b. Cost per Square Foot (CSF) shall be determined by the International Code Council <br /> Building Valuation Table in effect in January of each year. <br /> c. The cost per square foot(CSF)by occupancy classifications shall be amended as follows: <br /> 1. Groups F-1, F-2, H-1,H-2, H-3, H-4, and M shall have the same rate as A.-3. <br /> 2. Groups I-4,R-2, and R-4 shall have the same rate as I-1. <br /> 3. Groups S-1, S-2, and U shall have the same rate as R-3. <br /> d. Minimum Fee Thirty Forty dollars($30.00 $40.00). <br /> (2) Permits issued for all alterations,repairs,remodeling of existing structures over five hundred <br /> dollars ($500.00), fence installations, in-ground pool installations, communication towers, <br /> and utilities shall be subject to the following fee schedule: <br /> Estimated Construction Costs Permit Fees <br /> $1.00 to 1,000.00 30.00 <br /> 1,001.00 to 2,000.00 35.00 <br /> $1.00 to $12,001.00 to 3,000.00 40.00 <br /> 3,001.00 to 4,000.00 .... 45.00 <br /> 4,001.00 to 5,000.00 50.00 <br /> 5,001.00 to 6,000.00 55.00 <br /> 6,001.00 to 7,000.00 60.00 <br /> 7,001.00 to 8,000.00 65.00 <br /> 8,001.00 to 9,000.00 70.00 <br /> 9,001.00 to 10,000.00 75.00 <br /> 10,001.00 to 11,000.00 80.00 <br /> 11,001.00 to 12,000.00 85.00 <br /> 12,001.00 to 13,000.00 90.00 <br /> 13,001.00 to 14,000.00 95.00 <br /> (3) Thirty Forty dollars{$3 9,00$40.00) for each reinspection made by department inspectors of <br /> commercial and industrial projects. <br /> (4) Sixty dollars ($60.00) for each additional final inspection necessitated by the failure to pass <br /> the previous final inspection. <br /> (5)—(6) Reserved. <br />