Laserfiche WebLink
60-amp $ x-98 7.00 <br />100-amp X98 9.00 <br />200-amp X98 12.00 <br />400-amp -1-?:98 15.00 <br />600-amp -1-5-98 20.00 <br />Over 600-amp to 2,000 amp 29:88 25.00 <br />Over 2,000 amp 2-5:98 50.00 <br />(3) Circuits (new or replaced): <br />a. Each Circuit x:88 5.00 <br />(4) Horsepower (machinery): <br />a. First hp 7.00 <br />b. Each additional hp 0.25 <br />t 51 Pool wiring and/or bonding 20.00 <br />!6) Repair extension, and/or <br />Maintenance of wiring ?0.00 <br />{~}~ Reset. relocation and <br />reconnect fees, each 20.00 <br />I (~~~ Each re-inspection fee 25.00 <br />I (~}~ Each additional final inspection 50.00 <br />If the exact number of circuits or horsepower is unknown at the time of the application <br />for a permit, a permit may be taken for the minimum amount known with new permits issued as <br />the extent of the work known. <br />Section VII. Chapter 6, Article 6 of the South Bend Municipal Code shall be amended <br />to include a new Section 6-26 titled Low Voltage Contractor Registration to read in its entirety as <br />follows:. <br />Section 6-26 Low voita~e contractor Registration. <br />It shall be unlawful to en~a~e in business in the City as a contractor installing low voltage <br />wiring without first having_registered as required by this article. <br />Section 6-26.1Definitions. <br />4 <br />