My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-26-15 REVISED Agenda, Packet & Committee Meeting Notice
sbend
>
Public
>
Common Council
>
Committee Meeting Notices
>
2015
>
10-26-15 REVISED Agenda, Packet & Committee Meeting Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 2:10:55 PM
Creation date
10/22/2015 11:31:29 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Agendas
City Counci - Date
10/26/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(e) All plumbing installations requiring a permit shall be inspected by the plumbing inspector three <br /> (3)times,once each for underground work,rough-in work,and final completion.A complete line <br /> test shall also be supervised by the plumbing inspector. The plumbing permit holder shall notify <br /> the plumbing inspector at least twenty-four (24) hours in advance of the time the work is ready <br /> for inspection. If the work does not pass inspection, a reinspection fee of thirty forty dollars <br /> 030.00$40.00) shall be charged for each future inspection of that stage of work. <br /> Section VI. Chapter 6, Article 6, Section 6-23(i) of the South Bend Municipal Code pertaining to <br /> electrical licenses shall be amended to read as follows: <br /> i) License Fees: <br /> (1) Class A: <br /> New $100.00 $125.00 <br /> Renewal 480.00 125.00 <br /> (2) Class B: <br /> New and renewal $1-00.00 125.00 <br /> Section VII. Chapter 6,Article 6,Section 6-24 of the South Bend Municipal Code shall be amended <br /> to read as follows: <br /> Sec. 6-24. -Permits <br /> (c) Fees. Each application for a permit for installation or alteration of electrical wiring or equipment <br /> shall be accompanied by fees in accordance with the schedule below;with a minimum permit fee <br /> of thirty forty dollars($-30.00 ILflO: <br /> (1) Temporary service for construction: <br /> All amperage $ 7.00 <br /> (2) Switchboards and panel boards each, new and replaced: <br /> 60-amp 7.00 <br /> 100-amp 9.00 <br /> 200-amp 12.00 <br /> 400-amp 15.00 <br /> 600-amp 20.00 <br /> Over 600-amp to 2,000-amp 25.00 <br /> Over 2,000-amp 50.00 <br /> (3) Circuits(new or replaced): <br /> a. Each circuit 5.00 <br /> (4) Horsepower(machinery): <br /> a. First hp 7.00 <br /> b. Each additional hp 0.25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.