My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/17/2015 Agenda Review
sbend
>
Public
>
Public Works
>
Minutes
>
2015
>
09/17/2015 Agenda Review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:53:09 PM
Creation date
10/15/2015 9:20:08 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA REVIEW SESSION <br />SEPTEMBER 17 2015 308 <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids wore opened and publicly <br />read: <br />MIDLAND ENGINEERING COMPANY, INC <br />52369 State Road 933 North <br />South Bend, IN 46637 <br />Bid was signed by: Frederick J. Helmcn, President <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five portent (5%) Bid Bond was submitted <br />BASE BID: <br />Item <br />Description <br />Quantity <br />Unit <br />Total Amount <br />No. <br />1 <br />Membrane Roof system, sheet metal <br />1 <br />LS <br />$273, 000A0 <br />flashing, gutters, scuppers, <br />downs outs <br />2 <br />Sheet metal cornice restoration <br />1 <br />T,S <br />$ 22,000.00 <br />ALTERNATE: lotatotBase Bid $295,600.00 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No. <br />Amount <br />At <br />Cornice Repair <br />250 <br />SQFI <br />$155.00 <br />$38,750.00 <br />A2 <br />Scallop Detail <br />20 <br />EACH <br />$0.00 <br />$ 0,00 <br />Reattachment" <br />occ Bid ouppiement turacnea foul of Alternates $38,750.00 <br />Total of Base Bid and Alternates $334,350.00 <br />SLATILE ROOFING & SHEET METAL CO. INC. <br />1703 South Ironwood <br />South Bend, IN 46613 <br />Bid was signed by: Gerald Longerot, President <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BASE BID: <br />Item <br />Description <br />Quantity <br />Unit <br />Total Amount <br />No. <br />1 <br />Membrane Roof system, sheet metal <br />1 <br />LS <br />$244,218.00 <br />flashing, gutters, scuppers, <br />downspouts <br />2 <br />Sheet metal cornice restoration <br />1 <br />LS <br />$ 55,000.00 <br />ALTERNATE: <br />Total of Base Bid $299.218.00 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No. <br />Amount <br />Al <br />Cornice Repair <br />250 <br />S FT <br />$180.00 <br />$45,000.00 <br />A2 <br />Scallop Detail <br />20 <br />EACH <br />$48000 <br />$ 9,600.00 <br />Reattachment <br />Total of Alternates $54,600.00 <br />Total of Base Bid and Alternates $353,818.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.