Laserfiche WebLink
REGULAR MEETING AUGUST 25.2015 276 <br />Total Bid, Division A <br />$109,321A0 <br />Total Base Bid <br />A <br />$4,751,355.25 <br />None (Enter $0) <br />Bidder Credit <br />Choose t <br />B <br />$10,000.00 <br />Local (Enter Least of 3% or <br />$30,000) <br />Regional (Enter Least of 10/6 or <br />$10,000) <br />Nonc (Enter '0) <br />Workforce Credit <br />Choose 1 <br />C <br />$10,000.00 <br />Local (Enter Least of 2% or <br />$20,000) <br />Reggi�.onal (Enter Least of 1 % or <br />$10,000) <br />Total Base Bid Including Credits (A-B-C) <br />54,840,676.25 <br />Total Alternate A: Jefferson Boulevard (Sum <br />$346:837.65 <br />Items Al to A55) <br />Total Alternate B: St. Louis Boulevard and Part <br />$250,946.50 <br />of Wayne Street (Sum Items B1 to B37) <br />HRP <br />5777 Cleveland Road, P. O. Box 266 <br />South Bend, IN 46624 <br />Bid was signed by: Paul Fallon, President <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />M <br />Total Bid, Division A <br />$105,879.00 <br />Total Base Bid <br />A <br />$4,992,686.46 <br />Bidder Credit <br />(Choose 1 <br />None (Enter $O) <br />B <br />$10,000 <br />Local (Enter Least of 30/1 or <br />$30,000) <br />Regional (Enter Least of 1% or <br />$10,000) <br />C o <br />Workforce Credit <br />(Choose 1) <br />None (Emer 0) <br />C <br />$10,000 <br />Local (Enter Least of 2% or <br />$20,000) <br />Region -(Enter Least of 1% or <br />$10:000) <br />Total Base Bid Including Credits (A-B-C) <br />$4,972,686.46 <br />Total Alternate A: Jefferson Boulevard (Sum <br />Items Al to A55 <br />$369,103.39 <br />Total Alternate B: St. Louis Boulevard and Part <br />Of Wayne Street (Sum Items Bl to B37) <br />$242,385.77 <br />Upon a motion made by Mr. Gilot, seconded by Ms. Maradik and carried, the above bids were <br />referred to the Engineering Department for review and recommendation. After reviewing those <br />bids, Mr. Corbitt Kerr, Engineering, recommended that the Board award the contract to the <br />lowest responsive and responsible bidder Walsh & Kelly, Inc., 24358 St. Rd. 23, South Bend, <br />Indiana 46614, in the amount of $95,690.00 for Division A, and reserve the right to award <br />Division B to the lowest responsive and responsible bidder within sixty (60) days. Therefore, Mr. <br />Relos made a motion that the recommendation be accepted and the bid be awarded and The <br />contract approved as outlined above. Ms. Maradik seconded the motion, which carried. <br />OPENING OF BIDS — ONE (1) OR MORE 2015 OR NEWER PAVEMENT MARKING <br />MACHINES (TRAFFIC & LIGHTING CAPITAL LEASE PRINCIPAL & INTEREST) <br />