My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/25/2015 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2015
>
08/25/2015 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:54:00 PM
Creation date
9/8/2015 2:03:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/25/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING AUGUST 25. 2015 274 <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: $16,084,500.00 <br />Upon a motion made by Mr. Gilot, seconded by Ms. Maradik and carried, the above bids were <br />referred to Environmental Services and the Sewer Department for review and recommendation. <br />OPENING AND AWARD OF BIDS — EAST BANK SEWER SEPARATION — PRASE 5 — <br />PROJECT NO. 114-062 (2012 SEWER BOND & REDA TIF;t <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />SELGE CONSTRUCTION CO. INC. <br />2833 South 11"' Street <br />Niles, MI 49120 <br />Bid was signed by: Robert Kuhns, Project Engineer <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United Slates Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />LIM <br />Total Bid, Division A <br />S120,801.00 <br />Total Base Bid <br />A <br />$4895,248.85 <br />Bidder Credit <br />Choose 1) <br />uter None (E0) <br />B <br />$0 <br />Loca (Enter Least of 3 /° or <br />$30,000) <br />Regional (Enter Least of 1 % or <br />$10,000) <br />Workforce Credit <br />(Choose 1) <br />None (Enter 0) <br />C <br />$10,000,00 <br />$20,000 (Enter Least of 2% or <br />Regional (Enter Least of 1 % or <br />$10,000) <br />Total Base Bid Including Credits (A-B-C) <br />$4,885,248.85 <br />Total Alternate A: Jefferson Boulevard (Sum <br />Items Al to A55 <br />$409,681.35 <br />Total Alternate B: St. Louis Boulevard and Part <br />Of Wayne Street (Sum Items Bl to B37) <br />$250,086.25 <br />WALSH & KELLY, INC <br />24358 State Road 23 <br />South Bend, IN 46614 <br />Bid was signed by: Dustin Hilary, Area Manager <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: <br />Total Bid, Division A S95,690.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.