My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Approving a Contract Between City of South Bend and Richard C. Keogan for Dismanteling & Removing Water Works Stand Pipe
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1930
>
Approving a Contract Between City of South Bend and Richard C. Keogan for Dismanteling & Removing Water Works Stand Pipe
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 4:25:08 PM
Creation date
8/31/2015 3:23:43 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
7/14/1930
Ord-Res Number
2870-30
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br />Property damage, either to public or private property caused directly <br />or indirectly from the work in rasing and removing said standpipe. <br />It Is torther agreed that said Contractor shall provide a <br />bond in an unlimited amount with surety to be approved as by lam <br />Provided* which bond shall guarantee the faithful performance and <br />completion of the work herein referred to in accordance with all the <br />teams and conditions set forth in this contract, and particularly saving <br />the City from any loss by reason of personal injury., whether such <br />persons be in Contraotorts employ or not, and from property damage3, . <br />public and private. <br />✓ Progress in the process of demolition shall be from the top <br />dowavard and all material removed shall be io -eered to the bottom under <br />eontrol.. The lowering of raterial to the ground shall be done inside <br />,the tower. <br />In making an opening at The bottom of the tube for the removal <br />Of debris, the 8=0 shall be donee with full aonsideration for the <br />stability of the tube and such opening shall be not greater than <br />twenty-four inches (24") aids. Before making such opening the shell <br />of the tube shall be reinforced by bolting angles not Tess than <br />4°s4"X1 /2" one on each side of the opening and extending twelve (12) <br />inches above and below the opening to be made; bolts shall be three - <br />fourth inch (3/4 ") in diameter and not to be more than six inches (6") <br />center to center. 11%ese bolts shall,be placed and tightened as the <br />hales for the same are made. <br />In the removal of the brick masonry, care shall be taken to <br />avoi4 the falling of brick either outside the tower or inside the tube <br />and a suitable shield shall be maintained outside the ;masonry well <br />adjaeent to the workmen to catch aW debris which may fall. overboard. <br />The removal of brick masonry and steel tube shall proceed <br />simut,UM00aely and at no time shall the tube be permitted to extend <br />
The URL can be used to link to this page
Your browser does not support the video tag.