REGULAR MEETING JUNE 23, 2015 211 <br />motion that the recommendation be accepted and the purchase of one additional vehicle be <br />approved. Mr. Relos seconded the motion, which carried. <br />AWARD BID — HOTEL LASALLE RENOVATIONS -- PROJECT NO 115 -033A (RWDA <br />TIF) <br />Mr. Michael Carey, Engineering, advised the Board that on May 12, 2015, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Carey <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Kemna Restoration & Construction, Inc., 1122 Deloss Street, Indianapolis, Indiana 46203, in the <br />amount of $225,345.00. In a Memo to the Board, Mr. Michael Carey, Engineering, stated two (2) <br />of the bidders, Ziolkowski Construction, Inc. and Slatile Roofing and Sheet Metal Co., Inc., did <br />not meet either the MBE /WBE 7.1% participation goal or the requirements set forth in the Good <br />Faith Efforts Form and are therefore non - responsive to the bid. Therefore, Ms. Roos made a <br />motion that the recommendation be accepted and the bid be awarded as outlined above. Mr. <br />Relos seconded the motion, which carried. <br />AWARD BID AND APPROVE CONTRACT — WESTERN AVENUE CORRIDOR <br />IMPROVEMENTS & STREETSCAPES — PROJECT NO. 114- 033B/114 -085A (2015 TIF <br />INFRASTRUCTURE BOND) <br />Mr. Roger Nawrot, Engineering, advised the Board that on June 9, 2015, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Nawrot recommended <br />that the Board award the contract to the lowest responsive and responsible bidder Rieth -Riley <br />Construction Co., Inc., 25200 State Road 23, South Bend, Indiana 46614, in the amount of <br />$2,783,287.01 for Base Bid plus Divisions A and B, and Division A Alternate. Therefore, Ms. <br />Roos made a motion that the recommendation be accepted and the bid be awarded and the <br />contract approved as outlined above, subject to the Redevelopment Commission approval of <br />funding. Mr. Relos seconded the motion, which carried. <br />AWARD BID AND APPROVE CONTRACT — CHASE PLASTICS FACILITY <br />INFRASTRUCTURE IMPROVEMENTS — PROJECT NO 115 -051 (RWDA TIF) <br />Mr. Carl Littrell, Engineering, advised the Board that on June 9, 2015, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Littrell recommended <br />that the Board award the contract to the lowest responsive and responsible bidder Selge <br />Construction Co., Inc., 2833 S. 111h St., Niles, Michigan 49120, in the amount of $122,335.10 for <br />the Base Bid plus Alternate B. Therefore, Ms. Roos made a motion that the recommendation be <br />accepted and the bid be awarded and the contract approved as outlined above. Mr. Relos <br />seconded the motion, which carried. <br />AWARD QUOTATION — SIX (6) MORE OR LESS MOBILE COLUMN LIFTS (CENTRAL <br />SERVICES EQUIPMENT) <br />Mr. Jeffrey Hudak, Central Services, advised the Board that on April 14, 2015, quotations were <br />received and opened for the above referenced equipment. After reviewing those quotations, Mr. <br />Hudak recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, SEFAC, Inc., 23 Fontana Lane, Suite 109, Baltimore, Maryland 21237, in the amount of <br />$5,165.00 each for a total of $29,190.00 with trade -in. Therefore, Ms. Roos made a motion that <br />the recommendation be accepted and the quotation be awarded as outlined above. Mr. Relos <br />seconded the motion, which carried. <br />AWARD QUOTATION - TWO (2) MORE OR LESS IN GROUND HOISTS <br />REPLACEMENTS CENTRAL SERVICES EQUIPMENT) <br />Mr. Jeffrey Hudak, Central Services, advised the Board that on April 28, 2015, quotations were <br />received and opened for the above referenced equipment. After reviewing those quotations, Mr. <br />Hudak recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Ridge Company /Ridge NAPA Auto Parts, 1535 South Main Street, South Bend, Indiana <br />46613, in the amount of $10,198.00 each for a total of $28,196.00 with removal and installation. <br />Therefore, Ms. Roos made a motion that the recommendation be accepted and the quotation be <br />awarded as outlined above. Ms. Maradik seconded the motion, which carried. <br />AWARD QUOTATION — 2015 TREE & STUMP REMOVAL — PROJECT NO. 115-031 <br />MVH <br />Mr. Michael Carey, Engineering advised the Board that on May 12, 2015, quotations were <br />received and opened for the above referenced project, After reviewing those quotations, Mr. <br />