My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/24/08 Board of Public Works Regular Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2008
>
11/24/08 Board of Public Works Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2010 10:21:31 AM
Creation date
12/10/2008 3:29:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
11/24/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUBLIC: AGENDr1. SESSIO!~I NO~IEiyIBER 2 ), <br />"The Ptrblio Agenda Session of the Board of Public Works was convened at 10:35 a.m. on <br />Thursday, ~ovenaber 20, 2008, by Board Member Donald E. Inks with Board Member 7olzn F[. <br />Murphy present. Boaa•d President teary .A. t=ilot ~a~as ai~sexgt. Also presea~t ti~-as F3aard .~ttarr~e}; <br />Cheryl Greene. Board of Public Works Clerk, Linda M. Martin, presented the Board with a <br />proposed agenda of Means presented by the public and by City Staff. <br />Board members discussed the fallowing items from that list, <br />- Safety Reports -October 2008 <br />1`s~Ss. I0.-Saz-y ~%isnie~.~~ska, Ceniral Ser~,ices, ~~ald I+,~Sr. I)a~•id Tuxagate, Water ?~,~'arks, <br />presented their divisions' Safety Reports for the month of C3ctober 2(}08. <br />- Monthly and Performance Goals Repox€s -October 2008 <br />1vls. Mary Wisr~iervski, Central Services and_ Mr. David Tungate, Watex• ~/oa~ks, pre ed <br />their divisions' Monthly and Performance Goals Repox-ts for the month of Os;to <br />- Professional Services Contract -Design of ~`enturv Center Sculpture Garden and. `~:_.__ <br />Enhancements - Lelunatx & Let~xnan <br />iv/Ir. Chuck Lelzxttatx of Lelatnan & Lehman, Inc. was present regarding tlae above rc " _ <br />to Contract. Mr. Carl Littrell, City Engineer, stated the traffic signal, traffic signal cs <br />Systean xnoditications, ar~d lane markings 1leeded #o be part of the design. proje :t <br />included in the total cost. Mr. Littrell acknowledged that Mr. LelaaTtan previoti a"_• <br />to include sail testing at no eta cost ixl his proposal, but noted filaat soil'---`-- <br />probably riot be necessary. 1VIr. Littrell stated that they coaild review asbxzilts a <br />drawings to determine the type of sc- in the ground. Finally, iVlr. Littre <br />should be a txrit price bid with pre `1'ng specifications, not an t~IA C+ <br />Greeaxc added that the cost is capq~~d __ project at 51,6100,000.00; there ___ <br />wording f®r f~at~tre additional cost allowances. She reduested Mr. Lehxt~an r m ~c <br />18% per annum late fees, a tcrax-a a%bich Mr. Lehman stated. zx,~as already agreed to. i':~ir. <br />Lehman inlormecl ?he Board that he would recta the Pt°oposal with the regtxired cleaaages <br />and forward foa• review on Friday before the Board a#~ Works meeting on Mondav. <br />- Amendment to Professional Services Agreement - FInll c~ Associates, lnc. <br />Ms. !Onxx Kolata; Cc°Yununity and Economic Development; stated that she _.,.- <br />approval of an rlendment to the original Agreement for additional ~rc <br />sampling at tl ; fs • Cliver Flow Works property to finalize testing of rraic ~ -- <br />Csreene asked that s ° for~~~ard tt?e origiaxa9 .Agreea-ncnt to leer axed she ~vouid draw tip ttre <br />Amendment. <br />~_ Street Vacations -All Streets and 1Light-of Ways iz~ tlxe Crescent Oaks Subdi~rision <br />Mr. Carl L,ittrell, City Engineer, stated that after the original plat was recordex, er <br />was discovered in tlxe survey of the subdivision. `The Lots and streets are foa~N t~ ~^^~ <br />one direction and ten feet too far another direction. Mr. Littrell noted that t e <br />water mains appear to be in the correct locations. Ids stated once this has bee <br />they will re-plat the development correctly. IIe recctnmended that fibs vacs.: <br />directly to the Comx3~on Council vvitbout departmental review because City ds > <br />were rtat affected. <br />- Aivard Bid -Douglas Road Added `T'ravel Lanes <br />Mr. Ixxl~s duestioned placing the bid award on the agenda at this tune. Fie noted tl - he <br />inter-local Agree?aaent with the t:ity of Mishawaka for tlxis project was xaot yet <br />It was agreed between Mr. Inks, Mr. Littrell, and Ms. Greene that this bid award ; o uld <br />l:e tabled <br />t~PPROVAL OF C(3NTRACTS <br />The following Contracts were submitted to the Board for approval: <br />''1°'l~'P~ ~u~l[I~d~,S~ D;GSG>P']C'I®i~d ~l~If)LT1V'~' ?~i~T: -- i~ <br />Constrxtction Peerless- OIive Replacement $115,532.110 Inl: s/P;~S ~ <br />Contract Midwest, Inc. We11 3r1- Project No. (Water Worl~s <br /> 108-0~9 Capital) <br />Construction Peerless I~tgla ServLCe Ptamp #1 $17,?80.00 Inlcsll,4urpkz~ <br />Contract Midwest, mac. Rehabilitation -Project {Water Works i <br /> No, 108-084 Caarital i <br />
The URL can be used to link to this page
Your browser does not support the video tag.