My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/09/2015 Agenda Review
sbend
>
Public
>
Public Works
>
Minutes
>
2015
>
04/09/2015 Agenda Review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:57:54 PM
Creation date
4/28/2015 1:15:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA REVIEW SESSION APRIL 9, 2015 97 <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />ME <br />Division A Base Bid <br />$4,338 418.22 <br />Alternate B <br />$ <br />66,612.95 <br />Alternate C <br />$ <br />22,430.75 <br />Alternate D <br />$ <br />25,953. 55 <br />Alternate E <br />$ <br />27,845.00 <br />Alternate L <br />$ <br />5,000.00 <br />Alternate M <br />$ <br />30,760.00 <br />Division B Base Bid: $ <br />Alternate A: $ <br />Alternate B: $ <br />C & E EXCAVATING, INC <br />53767 CR 9 <br />Elkhart, IN 46514 <br />Bid was signed by: Thad Bessinger, Vice President <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: <br />Division A Base Bid S NO BID <br />Alternate B <br />$ NO BID <br />Alternate C <br />$ NO BID <br />Alternate D <br />$ NO BID <br />Alternate E <br />$ NO BID <br />Alternate L <br />$ NO BID <br />Alternate M <br />$ NO BID <br />Division B Base Bid <br />$ 990,047.50 <br />Banc Bid Less Credits A, B, C <br />$ 970,246.54 <br />Altemate A <br />$ 55,425.00 <br />Alternate B <br />S 60 610.00 <br />Attorney Michael Schmidt noted the bids would need further review by the review staff to confirm <br />all documents were in order. Upon a motion made by Mr. Gilot, seconded by Mr. Relos and <br />carried, the above bids were referred to Community Investment and Engineering for review and <br />recommendation. <br />OPENING OF BIDS — DEMOLITION OF 87 MORE OR LESS VACANT AND <br />ABANDONED HOUSES —PROJECT NO 115-012 (LOSS RECOVERY FUND) <br />This was the date set for receiving and opening of scaled bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County <br />News, which were found to be sufficient. The following bids were opened and publicly read: <br />HRP CONSTRUCTION INC. <br />5777 Cleveland Road, P. O. Box 266 <br />South Bend, IN 46624 <br />Bid was signed by: Paul J. Fallon, President <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />
The URL can be used to link to this page
Your browser does not support the video tag.