Laserfiche WebLink
EXISTING FLASHING SECTION 5 NEW FLASHING SECTION 5 <br />eece: i th - n> ry <br />Reference Appendix for addition derails and specifications. <br />Roof Sections: G — Greer Roof <br />1. Remove existing roofing system to the deck. <br />2. Install new IZ -20 Firestone Polcisnevanuratc. <br />3. Install new Pulh adhered 1P0 roofing system in accordance to receive a Firestone Red Shield 20 year Warrnnn. <br />3. Remove existing wall and cub fleshings and instal new '1110 fleshings as per Firestone's rcconnnendarions <br />5. Remote existing wall copings and reuse if applicable or install new 24 ga. Firestone copings. <br />112 <br />