Laserfiche WebLink
=ACHMENT G <br />MEASUREMENT AND VERIFICATION PLAN; <br />METHODOLOGY OF CALCULATING SAVINGS <br />SECTION 1: SAVINGS MEASUREMENT AND VERIFICATION <br />Utility Rates <br />'fable GI summarizes the baseline utility rates. 'lltese rates were used in establishing the Baseline and calculations <br />in this Attachment G. Throughout the Term of the Guarantee Period the utility rates in Table G 1, escalated at <br />3.0° �� Per Year shall be used in detcrnnining Annual Savings. This escalation factor is based upon the Federal <br />E:ncigy Ni:umgenunt Program ()--ENIP). Encrgy ]iscalation Rate Calcadator (FITAC. 2.0 -13) tool which is <br />developed using historical utility information.'I'lie Customer acknowledges and accepts the utilin. rates set forth <br />in 'fable GI as reasonable. 'fable G2 summarizes baseline data received b) Ameresco from Customer. <br />Table G1: Utility Rates <br />All Buildings $0.079 $4.70 $0.572 <br />Table G2: Existing Utility Information <br />Measurement &Verification Overview <br />For each Guarantee Year for which .\nhcresco is obligated to provide : \I \' Cervices, .\meresco mil complete <br />the :uumm MSC\' $e•rvices as set forth herein and document its findings, including the determination of annual <br />Savings, in the annual NhC\' Report, Allicresco shall submir the annual MeC\' Report to Customer as set forth <br />below. <br />The approach to M"N' is based rnt the Intcmmimhal Performance Measurement and \'crifieation Protocol <br />QPNI \'P) \'olunre 1 2012 (Jarman. 2012). IYNI \'P \'ol une I is a guidance document describing connnon <br />practice in nycasunlig, computiniti, and reporting s:nings achieved by energy or water efficiency projects at end <br />user fiacilities. "lhc IPM\'P presents a framework and the four.\lR\- options. for purposes of this Agrcenhent, <br />the Parries have adsa included an additional NIcC \' Option — "Agreed Upon" sayings. "Agreed I'pon" savings <br />are not subject to measurement or verification and do not include measurement and verification activities and <br />is utilized on LiC: \Is where rbe costs to accurately c lcuLne, measure, or monitor the projected savings would be <br />crcater than the ouhtieioated sayings value. <br />52 <br />