My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-15 Agenda, Packet & Committee Meeting Notice
sbend
>
Public
>
Common Council
>
Committee Meeting Notices
>
2015
>
04-13-15 Agenda, Packet & Committee Meeting Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2015 12:27:40 PM
Creation date
4/9/2015 12:10:28 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Agendas
City Counci - Date
4/13/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G) Lighting. —will be replaced. <br />7) 1 -ICAC Grills and Registers —I 'M. sting I I VAC Grills and Registers will be reused in the new ceding, at <br />the sane• locations. <br />4) Removal Sections -Area by V`indows will have to have access to roof. <br />a. N\'ith new roof, there will be anchors being added for window washing and they will need to <br />he inspected ,yearly. <br />b. Sections will need to be removed for inspection. <br />Gen — Great HA11- Corridor Areas Ceiling Tile Removal and Replacement <br />1) Ceiling ,files are to be removed in: (ref. drawing Lower Section F Great hall Surrounding ceiling) <br />2) Note: Existing Spline Ceiling tiles will be removed and replaced xvith ceiling grid and lay -in 2x2 tiles <br />Location of the new ceiling mill be the sinc height as the old ceiling, to use existing sprinkler heads <br />and sensors. <br />.i) New Ceiling Grid - Armstrong, Techl,ine 877 Armstrong, Prelude \I, 15/16" Exposed 'I'm, System. <br />(Ref. attached .l nrstrong specification) <br />4) New Ceiling Tile — .Amistrong, TecbLine S 77 Armstrong, Cortega, (,ortegn Second look, Square Lup- <br />in and Tegular, nncdiuni texture tile:. (Ref. attached Armstrong spec) <br />5) Fire :Wrtn — Existing Sprinkler heads and sensors will remain and be reused in the new ceiling at <br />sine locations. <br />6) Audio Swstem — Existing Audio system will remain and he reused in the new Ceiling, at sane locations. <br />7) Lighting — Existing Lighting will he replaced. <br />S) HVAC Grills and Registers — I':xisting I IVAC Grills and Registers will be reused in the new ceiling, at <br />the same locations. <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.