Laserfiche WebLink
Cost Avoidance Calculations <br />City of South Band • Century Center Building Area (sq -n): 225.000 <br />Methodolont <br />I Avoitleti Cost is defined as the COST of WAITWG,(Fulure Cost) MMUS TODAY'S MST(Cument Cost) <br />2 Current Quart costs are based on are calcuaged using RS Means estimates and may wry from actual project costs In this contract. <br />3 ECM Descdplions & costs are shown as (CUnent Client Cost) <br />4 Conant cost is adjusted by annual inflation factor over the project duration (years) In addition to miscellaneous adjustment <br />5 factors as listed in Assumptions then calculated 8 shown as (Future Client Cost) <br />6 Annual payments for the Future Cast are summarized oser the Project duration (total years) and shown as (Future trial Annual pots) <br />7 Awided Cost Is the difference between financed (inure cost and current cost ciNded by Project duration (total years) <br />Unplanned equipment relacementfactor <br />Economy ofscale factor for multiple proegs <br />- <br />7.00Y <br />Comin ehc <br />Sga <br />Other - <br />0.00 <br />Other <br />p, <br />Other <br />Inflation compounded annually for Nper years in resulting calculations • ENTER ANNUAL rate here <br />106 <br />