Laserfiche WebLink
ATTACHMENT G <br />MEASUREMENT AND VERIFICATION PLAN; <br />METHODOLOGY OF CALCULATING SAVINGS <br />SECTION 1: SAVINGS MEASUREMENT AND VERIFICATION <br />Utility Rates <br />Table G] Summarizes the baseline tttiliry rates. 17tese rates were used in establishing the Baseline and calculations <br />in this Attachment G. Throughout the Tenn of the Guarantee Period the utility rates ill Table G 1, escalated at <br />301,, per rear shall be used in dctermtining Annual Sayings. 'lhis escalation factor is based upon the Feder-al <br />Encip Management Program (FEM13) 1311ergc Escalation Rate Calalator (EIS.(', 2.0 -13) tool which is <br />developed using historical utility information. The Customer acknowledges and accepts the utility rites set forth <br />in Table G1 a reasonable. Table G2 summarizes baseline data received br Ameresco from Customer. <br />Table GI: Utility Rates <br />All Buildings $0.079 $4.70 $0.572 <br />Table G2: Existing Utility Information <br />Measurement &Verification Overview <br />For each Guarantee Year for whit h Ameresco is obligated to provide \Iel\' Scc•rviec•s, Ammresco will complete <br />the anuu;d . \4l \' Srryiecs as scl forth herein and document its findings. including the detcrmrimtion pf annual <br />savings, ill the ;turn1l Nl& \' Report .lmereseo shall submit to Customer as set forth <br />below. <br />The approach to \IcC \' is based on the lntemational Performance \Ieasnrenent ate] \'etifreation Protocol <br />(IP \I\ P) Volume 1 2012 (Januar 2012). IPJINI\P \'olumc 1 is a guidance document describing common <br />practice in measuring, mnhputing, and reporting savings achieved br energy or water efficieuc% proiccts at end <br />user facilities. '111e IImU\'P presents a fr:unework and the four M&fi - options. For purposes of this Agreemem, <br />the Parties have also included an additional M&\' Option — "agreed Upon" sayings. "Agreed l'pon" savings <br />are not Subject to mu•asuM)WIlt or Verification and do not include measurement and verification activities and <br />is utilized on I.i(:AIs where the costs to accurarely calculate, measure, or monitor the projected savings would be <br />ere•ater than the anficinated sarines value. <br />52 <br />