Laserfiche WebLink
6) Lighting. —kill be replaced. <br />HCAC Grills and Rcghsters — Existing LR':1C Grills and Registers will be reused in the new ceiling, at <br />the s:m t, locations. <br />S) Removal Sections - _area by Windows will have. to have access to roof. <br />a. NVith ncty roof, there will be anchors being added for window washing and the} will need to <br />be inspected yearly. <br />b. Sections will need to be removed for inspection. <br />Gen — Great Hall - Corridor Areas Ceiling Tile Removal and Replacement <br />1) Ceiling Tiles are to be removed in: (ref. drawing Lower Section P Great 1-Jill Surrounding ceiling) <br />2) Note: Existing Spline Ceiling tiles will be removed and replaced yridt ceiling grid and lay -in 2x2 tiles. <br />Location of the new ceiling will be the same height as the old ceiling, to use existing sprinkler heads <br />and sensors. <br />3) Neyv Ceiling Grid — Armstrong, Techl.iric 877 Arnietro rg, Prelude XL 15/16" Exposed Tee System. <br />(Ref. attached .Armstrong specification.) <br />4) New Ceiling'I'ile — Armstrong, l'echl.,ine 877 Armstrong, Cortega, Cortega Second Look, Square Lip - <br />in and Tegular, medium testurc tiles. (Ref. attached .Armstrong spec) <br />5) Tire Alarm — I xisting Sprinkler heads and sensors will remain and he reused in the new ceiling at <br />same locations. <br />6) .Audio System — Laisting Audio scstem gill remain and be reused in the new ceiling, it same locations. <br />7) Lighting — Idsisting Lighting will he replaced. <br />3) IJVAC Grills and Registers — Existing I IVAC Grills and Registers Dill he reused in the new ceiling at <br />the same locations. <br />41 <br />