Laserfiche WebLink
o Reuse all existing binary input devices. <br />o Reuse all existing start /stop and interlock relays. <br />• Control . of existing\'1'+lls. <br />• Control of existing calve: and dampers. <br />• ;Monitoring of existing smoke. detectors. <br />• Existing point to point wiring to be rcuscd. <br />• New BACnet communication trunk to iC1 -FS -60 supervisor. controller. <br />5.4 — C\YS (1) Chilled Water Control System <br />• FX -ECG DDC Controller xvith requited expansion modules. <br />• New controller to he installed in existing enclosure in central plant. <br />• New hydronic temperature sensors. <br />• New chilled e.ucr pressttre sensor. <br />• Reuse all existing binary input devices. <br />• Reuse all existing start /stop and interlock relays. <br />• Control of existing F FDs. <br />• Control of existing valves. <br />• Existing point to point wiring to be reused. <br />• 13ACmct integration of Carrier controllers (BACnct cnnvnunication ends by others). <br />• Ncw 13ACnct communication trunk to SCI -FS -60 supervisory controller. <br />55 — J AX'S (1) 1 -Jot Water Control System <br />• FX -PCG DDC Controller with required expansion modules. <br />• New controller to be installed in existing enclosure in central plant. <br />• New hcdrotic temperature sensors. <br />• Reuse all existing bitntn. input devices. <br />• Rcusc all existing start ;stop and interlock rclacs. <br />• Control of existing \"ells. <br />• Control of existing calves. <br />• lsisting point to point wiring to be reused. <br />• BACnct integration of 13oiler Staging Panel (13ACnct communication cards by others). <br />• New BACnet communication trmrk to iCI -FS -60 supervisor- controller. <br />5.6 — Cool Tower (1) Cooling Tower Control System <br />• I .S -PCG DDC Controller with required expansion modules. <br />• New controller to he installed in existing enclosure in mechanical moor. <br />• New hydronic temperature sensors. <br />o Reuse all existing binan input devices. <br />o Reuse all existing start , istop and interlock relays. <br />o Control of existing \ I-s. <br />o Control of existing valves. <br />o Existing point to point wiring to he reused. <br />o New BACnct communication trunk to JCI- PS -Cr0 supervisory controller <br />5.711 — \-AY (IS) Variable Air Volume Box Control and T'nunk <br />o N2 intepiion of existing DDC \"AC box controllers- <br />5.8 —AI -IU VI--D (14) . \ir I landlinq Unit Supply Fan \'I-D's <br />• Start /stop, status, and speed control signals for fan \T1Ds. <br />• BACnet integration of \'FDs 03.\Cnct communication cards Iry others). <br />o \'FDs prodded by others. <br />5.8 — Pumps (1) f lydronic Pumping Modifications <br />o Start /stop, status, and speed control signals for fan \TDs. <br />0 BACnet integration of 03ACnet communication cards by others). <br />36 <br />