Laserfiche WebLink
Century Center - Roof Specifications <br />Roof Section <br />Roof Type <br />Roof Specification (Firestone or approved equivalent) <br />A <br />Standard 20 Year TPO <br />Firestone Spec. -Section 07 5423 Themtoplastic - Polclefn Roofing -TPO, <br />U1traPly Platinum TPO 0.060" Membrane Slsrem. <br />l; <br />Solar Pancls(future) <br />Firestone Spec. Section 07 07 00 — Building Integrated Photovoltaic SyMills <br />C <br />Standard 20 Year TPO <br />Firestone Spec. - Section 07 5423 T7u•rmoplastic - PolyleQn Roofing - TTO, <br />UlmPly Pluinum TPO 0.060" Mcnrbraae Scstcm. <br />D <br />Standard 20 Year TPO <br />Firestone Spec. - Section 07 5423 Therorophistic - Poclefin Roofing - TPO, <br />UltraPly Platinum TPO 0.060" \lembrane System. <br />E <br />Standard 20 Yexr'ITO <br />Firestone Spec. - Section 0- 5423 lltcnnoplustic - Polclefin Roofing -TPO, <br />UlteaPlr Platinum TPO 0.060" Menrbnuu Scstcm. <br />I, <br />Standard 20 Ycar'ITO <br />Firestone Spec. - Section 07 5423'17rennoplastic - Polclefin Roofing <br />nn <br />UlPh Platinum 7PO 0.060" Membrane System. <br />G <br />Green Ronf . \ppliaition <br />Firestone Spec. Section 0%.33.63 Vegetated Roof Scstcm, Skyseape <br />Hxtunsice \'ebn•ruiye Roof system, Firestone Building Products. <br />Roof Sections G — Greell Roof <br />1. Remove existing roofing system to the deck. <br />2. bisull new R -20 I- �ireslone Polyisocymmrare. <br />3. Install new Fully Adhcred'1P6 roofing system in accordance to receive a Firestone Red Shield 20 <br />year \\'armary. <br />4. Remove existing wall and curb tlashiriW and insndl new TPO flasltings as Per Firestone's <br />recomnlenclmiona <br />5. Remove existing wall copings and reuse if applicable or inslall new 24 ga. Firestone copings. <br />Systems to be installed: <br />Reference Appendix A attached Firestone specification: <br />• Firestone Spec 0 5423, 0.060 "'1PO, 20 Year Warranty Full' Adhered <br />• Firestone Spec 0: 5423, 0.060" TPO, 20 Year \C'arrannv, Im isi\Pcic] - Induction Welded System. <br />• Firestone Spec U- 33 63A Vegetative Roof System, Skysmape semi- Intensive Vegc•tettive Roof Scstcm, <br />Fire.mjiv Building Products. <br />• Firestone Spec. Sect IF n- 00 Building integrated Photovoltaic System <br />ECM 2: Lighting Replacement <br />Base Project - Lighting opgrades, Ocnip:utec Sensors, Vending \fixers <br />• Base Project: <br />• For a Room by Room Lighting audit reference Attachment G. <br />26 <br />