Laserfiche WebLink
REGULAR MEETING <br />FEBRUARY 24 2015 43 <br />Item No. Description <br />Removal, Management, and <br />Disposal of PCB Remediation <br />1 Waste (Concrete Floor and <br />Drainage System) in accordance <br />with Contract Documents and <br />Replacement of Concrete Floor <br />2 and Drainage System in <br />accordance with Contract <br />Documents and Specificationq <br />TOTAL AMOUNT ITEMS 1 THRU 2 <br />Quantity Unit Price Total Amount <br />1 Lump Sum $91,706.00 <br />1 I Lump Sum $ 17,700.00 <br />$109,406, 00 <br />Item No. <br />I. <br />Unit Pricing if Required <br />Removal, Management and Disposal <br />of PCB -impacted concrete to PCB <br />Disposal Facility or RCRA Type C <br />Disposal Facility <br />Unit <br />TON <br />Add Per Unit <br />Price <br />$ 451.00 <br />H. <br />Removal, Management, and Disposal <br />of PCB -impacted concrete to RCRA <br />Type D Disposal Facility <br />TON <br />$ 256.00 <br />III, <br />Excavation, Removal, Management, <br />and Disposal of PCB -impacted soil to <br />PCB Disposal Facility or RCRA Type <br />C Disposal Facility <br />TON <br />$ 414.00 <br />IV. <br />Excavation, Removal, Management, <br />and Disposal of PCB -impacted soil to <br />RCRA Type D Disposal Facility <br />TON <br />$ 195.00 <br />V. <br />Backfill and/or Fill obtained, <br />transported, placed, graded, and <br />compacted, from off -site source. <br />Cubic Yard <br />$ 81.00 <br />RCRA, INC <br />DBA EARTH SERVICES <br />10903 Prestwick <br />Drive <br />Benton, IL 62812 <br />Bid was signed by: Josh Appleton, President <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />BID: <br />Item No. Description <br />Removal, Management, and <br />Disposal of PCB Remediation <br />1 Waste (Concrete Floor and <br />Drainage System) in accordance <br />with Contract Documents and <br />Specifications <br />Replacement of Concrete Floor <br />2 and Drainage System in <br />accordance with Contract <br />Documents and Specifications <br />TOTAL AMOUNT ITEMS 1 THRU 2 <br />Quantity I Unit Price I Total Amount <br />1 Lump Sum 1$66,400.00 <br />1 1 Lump Sum I $ 23,000.00 <br />$89,400.00 <br />