Laserfiche WebLink
REGULAR MEETING FEBRUARY 10, 2015 25 <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Local Preference submitted. <br />Ten percent (10°%) Bid Bond was submitted <br />Description <br />Year/Make/Model <br />Unit Price <br />(3) 25 Yard Packers <br />2016 Freightliner 114SD wlWayne 25 yd Body <br />$608'634.00 <br />Option# <br />Description <br />Cost <br />Total <br />1 <br />CNG Fuel System <br />$44,563.00 <br />each <br />each <br />$133678900 <br />2 <br />Complete scale system. Vulcan Model R-206L <br />or equal. Unit to be 6 cell with set point <br />controller to support (2) 5 amp devices. <br />0.00 <br />each <br />$ 36,450.00 <br />BEST EOUIPMENT CO., INC <br />5550 Poindexter Drive <br />Indianapolis, IN 46235 <br />Bid was signed by: Maria Dahlmann <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted <br />Description <br />Year/Make/Mode[ <br />Unit Price <br />25 Cubic Yard Packer <br />2016 Freightliner SD-114 <br />$196,733.00 <br />Option# <br />Description <br />Cost <br />Total <br />1 <br />CNG Fuel System <br />$42,313.00 <br />$ 42,313.00 <br />2 <br />Complete scale system. Vulcan Model R- <br />206L or equal. Unit to be 6 cell with set point <br />controller to support (2) 5 amp devices. <br />$16,520.00 <br />$ 16,540.00 <br />MCNEILUS TRUCK & MFG. <br />1130 Morrison Road <br />Gahanna, OH 43230 <br />Bid was signed by: John A. Needham <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />Description I Year/Make/Model Unit Price <br />