Laserfiche WebLink
CITY OF SOUTH BEND <br />2000 CAPITAL BUDGET -DETAIL LISTING OF CAPITAL EXPENDITURES <br />Traffic signal detection loop repairs <br />Street surface profiling (rotomill contractor) <br />US 20 improvements: <br />Eclipse to Olive - 5 lanes <br />Design -Olive to LaSalle <br />Design - Hill to Jacob <br />Study -Reroute Jacob to St. Joseph <br />Chapin / Lincolnway West landscaping <br />Salt Storage Barn design and construction (portion not funded by General Fund) <br />Ireland Road /Miami Road signal modernization system -study & design <br />Cleveland Road - Bendix to Ralph Jones Drive (excludes $600,000 funded by Airport TIF) <br />Cleveland Road - Mayflower to Brick Road <br />Total Land Improvements for LRSA <br />MATERIALS AND EQUIPMENT: <br />Asphalt paving materials <br />Alley dust control materials (Pennz Suppress Contractor) <br />Total Materials and Equipment for LRSA <br />17-Jan-0O <br />ESTIMATED <br />COST <br />20,000 <br />60,000 <br />700,000 <br />140,000 <br />35,000 <br />50,000 <br />50,000 <br />272,000 <br />60,000 <br />500,000 <br />1,200,000 <br />3,637,000 <br />1,000,000 <br />65,000 <br />1,065,000 <br />TOTAL LRSA CAPITAL BUDGET 4,702,000 <br />CONSOLIDATED BUILDING DEPARTMENT: <br />BUILDINGS AND BUILDING IMPROVEMENTS: <br />New office renovation ($100,000 funded over several years based upon funding availability) 31,151 <br />Total Buildings and Building Improvements for Building Department 31,151 <br />MOTOR VEHICLES: <br />4 Compact Autos (pre-owned) -replaces 1992 Ford Tempo, 2 1995 Cavaliers & 1996 Cavalier 40,000 <br />Total Motor Vehicles for Building Department 40,000 <br />COMPUTER EQUIPMENT 8 NETWORKING <br />8 Computer upgrades 8,800 <br />Permit Software 40,000 <br />Total Computer Equipment & Networking for Building Department 48,800 <br />TOTAL CONSOLIDATED BUILDING CAPITAL BUDGET 119,951 <br />SOLID WASTE: <br />MOTOR VEHICLES: <br />4 - 20 yard Packers -replaces 1985/1986 Ford packers -Finance $478,400 cost over 5 years at 6.5°h 113,602 <br />2 Lightning loaders -replaces 1989 8 1991 Ford trucks -Finance $170,000 wst over 5 years at 6.5°~ 40,369 <br />5 Roll off boxes -new -needed for refuge pickups 22,531 <br />Total Motor Vehicles for Solid Waste 176,502 <br />TOTAL SOLID WASTE CAPITAL BUDGET 176,502 <br />WATER WORKS: <br />LAND IMPROVEMENTS: <br />Main Extensions ($600,000 for 2000 plus $489,139 unspent from 1999) 1,089,139 <br />Clean wells - 1 well at Cleveland, 2 wells at Edison end 2 wells at North Station 70,000 <br />Concrete and asphalt repairs 60,000 <br />Value replacement 40,000 <br />Total Land Improvements for Water Works 1,259,139 <br />BUILDINGS AND BUILDING IMPROVEMENTS: <br />Roof repair - So Control room, Cleveland Control room, Edison 15,000 <br />Total Building and Building Improvements for Water Works 15,000 <br />MOTOR VEHICLES: <br />Utility vehicle, 4WD with 2 door -replaces 1995 Chevy Blazer 26,000 <br />Tandem dump truck -replaces 1987 Ford truck 80,000 <br />2 Extended cabs with utility body -replaces 2 1994 Chevy trucks 54,000 <br />4 Pick-up trucks, 3/4 ton with 8' beds -replaces 1990 & 19931/2-ton trucks & 21993 S10 trucks 76,000 <br />2 - 185 cfm compressors -replaces 2 1989 compressors <br />Compact auto ( <br />re-owned) -for new em <br />lo <br />ee 14,000 ~ ~ ~ C ~ 1 n ,nom <br />~t <br />"J <br />p <br />p <br />y <br />Total Motor Vehicles for Water Works 1p,p00 y `t <br />J <br />~ <br />260,000 ~ 2~w <br />