Laserfiche WebLink
Olive Road 3 Annexation Area 5 <br />K. Hiring Plan <br />It is anticipated that this annexation will not result in the elimination of jobs for employees of any <br />other governmental entities. The German Township Trustee has been notified of this annexation. <br />SECTION III. MUNICIPAL SERVICES <br />A. Public Works <br />Sewer - The sanitary sewer mains are currently in place and available to service the area. <br />No additional expenditures will be needed to extend existing sewer main facilities. <br />Water - There is currently a 16" water main on the west side of Olive Road and a 10" water main <br />on the south side of Enterprise Drive. A flow test at Olive Road and Cleveland Road on June 11, <br />2002 indicated a static pressure of 59 psi, residual pressure of 50 psi, and a flow rate of 1,170 gpm. <br />No additional expenditures will be needed to extend existing water main facilities. <br />Street Lighting - Street lighting is already being provided through a previous annexation <br />Waivers of Annexation - No waivers of the right to remonstrate against an annexation are in effect <br />for this area. <br />Streets - The Olive Road right -of -way was annexed into the City under a previous annexation <br />Drainage Plan - Widening of Olive Road will necessitate a drainage plan as a part of the project. <br />2000 Operating Budget for the Department $2,550,312 <br />Reconstruction/Maintenance of Roads <br />snow removal and leaf - pick -up: $993,058 <br />Total $3,543,370 <br />Miles of Roadway: @472 <br />Cost per Mile: @$7,507 <br />New Mileage (est.) .0 miles (01) <br />Cost for Annexation Area per year: @$0.00 <br />When fully developed, this annexation area is not expected to require major capital outlays for <br />public works vehicles or equipment. <br />Extensions of, or taps into sanitary sewer and water lines shall be governed by I.C. 36- 9 -22 -2, <br />I.C. 8 -1.5 -3 and 4, and the rules and regulations of the South Bend Water Works and Sewer <br />Utility. <br />