My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fiscal Plan for Duance O. & Virginia M. Zeiger Annexation Area in Centre Township
sbend
>
Public
>
Common Council
>
Legislation
>
Resolutions/Special Resolutions
>
2004
>
Fiscal Plan for Duance O. & Virginia M. Zeiger Annexation Area in Centre Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2014 2:07:44 PM
Creation date
11/20/2014 9:22:02 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Resolutions
City Counci - Date
4/12/2004
Ord-Res Number
3317-04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Duane O. and Virginia M. Zeiger Annexation Area <br />Cost per Mile: @$4,429 <br />New Mileage within Annexation Area(est.): @2.79 miles (14,754 feet) <br />Total anticipated Maintenance cost: @$12,357 <br />Cost for Annexation Area per year: @$12,357 / 3 = $4,119 * 2 = $8,238.00 (rounded) <br />When fully developed, this annexation area is not expected to require major capital outlays for <br />public works vehicles or equipment. <br />Extensions of, or taps into sanitary sewer and water lines shall be governed by I.C. 36- 9 -22 -2, <br />I.C. 8 -1.5 -3 and 4, and the rules and regulations of the South Bend Water Works and Sewer <br />Utility. <br />B. Police Department <br />The noted area would be expected to be added to the already existing BEAT 15. Police patrols, <br />traffic enforcement, and emergency responses will be part of the services the City will offer to this <br />area. This proposed annexation would require officers to cover a relatively small additional area to <br />this beat. It is located in an area of the city that was recently annexed into the City and is expected <br />to Continue to crow, both in commercial development as well as residential. <br />At this time it is not expected that this annexation would cause calls for service to increase <br />significantly and it is not anticipated that it will be necessary to increase police patrols beyond the <br />already existing beat patrol at this time. The area under consideration is not expected to cause any <br />unusual problems. Cost for servicing this area would be expected to be absorbed by the existing <br />budget of the Police Department, as the addition of this area would not be significant to the point <br />of having to increase any budgetary items. Police services and response time in this area can be <br />expected to be comparable and consistent with that as in all other areas of the City. Police <br />coverage to this area could begin immediately upon annexation and coordination of the conversion <br />of the 911 emergency phone system for that area. <br />Note: It is anticipated that the services of this Department will not be required to a great extent, <br />although monitoring will still be conducted. Therefore, the service cost of the Department has <br />been reduced by two- thirds to reflect a more realistic actual cost to service the Annexation Area in <br />the first five years. <br />2002 Budget Report for the Department: <br />Expenditures: <br />Number of Parcels in City (2003): <br />Cost per Parcel: <br />Proposed Number of Parcels in Area: <br />Cost for Annexation Area per year: <br />$7,427,294 <br />@47,462 <br />@$446 <br />265 <br />@$118,190 / 3 = $39,397 <br />
The URL can be used to link to this page
Your browser does not support the video tag.