Laserfiche WebLink
Gregor /Beall Annexation Area 6 <br />When fully developed, this annexation area is not expected to require major capital outlays for <br />public works vehicles or equipment. Cost of road maintenance will be greatly reduced during the <br />early years of this development in anticipation that major repairs will not be needed. <br />B. Police Department <br />The noted area would be expected to be added to the already existing BEAT 22. Police patrols, <br />traffic enforcement, and emergency responses will be part of the services the City will offer to this <br />area. This proposed annexation would require officers to cover a relatively small additional area to <br />this beat. <br />At this time it is not expected that this annexation would cause calls for service to increase <br />significantly and it is not anticipated that it will be necessary to increase police patrols beyond the <br />already existing beat patrol at this time. The area under consideration is not expected to cause any <br />unusual problems. Cost for servicing this area would be expected to be absorbed by the existing <br />budget of the Police Department, as the addition of this area would not be significant to the point <br />of having to increase any budgetary items. Police services and response time in this area can be <br />expected to be comparable and consistent with that as in all other areas of the City. Police <br />coverage to this area could begin immediately upon annexation and coordination of the conversion <br />of the 911 emergency phone system for that area. <br />It is anticipated that the services of this Department will be minimally required to service the <br />Annexation Area in the first five years. Therefore, the service cost of the Department has been <br />reduced by one -third to reflect a more realistic actual cost to service the Annexation Area in the <br />first five years. <br />Note: The cost of service for this Annexation Area is based on the number of parcels. Household <br />information is provided for comparative purposes. <br />2002 Budget Report for the Department: <br />Expenditures: <br />Number of Households in City (2000): <br />Cost per Household: <br />Number of Parcels in City (2003): <br />Cost per Parcel: <br />Proposed Number of Households in Area: <br />Number of new Parcels: <br />Cost for Annexation Area per year: <br />C. Fire Department <br />$7,427,294 <br />@42,908 <br />@$173 <br />@47,462 <br />@$156 <br />2 <br />2 <br />$208 (S156 • 2 = S312 13 = $104 - 2) <br />The Annexation Area will be serviced primarily by Station #11, located at 3505 N. Bendix Drive <br />approximately point two point four (2.4) miles away. Additional Fire Department units would <br />respond from Fire Station 47 located at 1616 Portage Avenue which is approximately four point <br />seven (4.7) miles away. <br />The South Bend Fire Department does not foresee any unusual fire protection problems related to <br />this annexation. Response times will be comparable to other areas of the City. No additional <br />