Laserfiche WebLink
John D. and Jay L. Gillis Annexation Area 6 <br />Additional revenue to the General Fund from this annexation area will be sufficient to pay for <br />street light operations on Portage Highway and on Brick Road. <br />Drainage Plan - Drainage facilities will be required to be constructed by the developer. <br />General Budget Analysis <br />2002 Budget Report for the Department: <br />Expenditures: <br />State Revenue: <br />Balance: <br />Miles of Roadway in City: <br />Cost per Mile: <br />New Mileage within Area: <br />Total estimated Maintenance cost: <br />Anticipated State revenue /mile: <br />Cost for Annexation Area per year: <br />$7,427,294 <br />$5,341,296 <br />$2,086,165 <br />@471 <br />@$15,769 <br />@.34 miles (1,800 feet) <br />@$5,361.46 <br />@$3,856 ($11,340 *.34 = $3,856) <br />@$1,505 <br />When fully developed, this annexation area is not expected to require major capital outlays for <br />public works vehicles or equipment. Cost of road maintenance will be greatly reduced during the <br />early years of this development in anticipation that major repairs will not be needed. <br />B. Police Department <br />The Annexation Area would be expected to be added to the already existing BEAT 22. Police patrols, <br />traffic enforcement, and emergency responses will be part of the services the City will offer to this <br />area. This proposed annexation would require officers to cover a relatively small additional area to <br />this beat. <br />The Annexation Area is located in an area of the city that is expected to continue to grow, both in <br />commercial development as well as residential. At this time it is not expected that this annexation <br />would cause calls for service to increase significantly and it is not anticipated that it will be <br />necessary to increase police patrols beyond the already existing beat patrol at this time. The area <br />under consideration is not expected to cause any unusual problems. Cost for servicing this area <br />would be expected to be absorbed by the existing budget of the Police Department, as the addition <br />of this area would not be significant to the point of having to increase any budgetary items. Police <br />services and response time in this area can be expected to be comparable and consistent with that <br />as in all other areas of the City. Police coverage to this area could begin immediately upon <br />annexation and coordination of the conversion of the 911 emergency phone system for that area. <br />