My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(3)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2014
>
09-25-14 Redevelopment Commission Meeting
>
6B(3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2014 9:10:04 AM
Creation date
9/24/2014 9:10:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Perform or provide the following additional Bidding or Negotiating Phase tasks or <br /> deliverables: None • <br /> B. The Bidding or Negotiating Phase will be considered complete upon commencement of the <br /> Construction Phase or upon cessation of negotiations with prospective contractors (except as may <br /> be required if Exhibit F is a part of this Agreement). <br /> Al.05 Construction Phase <br /> A. Upon successful completion of the Bidding and Negotiating Phase, and upon written authorization <br /> from Owner,Engineer shall: <br /> 1. General Administration of Construction Contract: Consult with Owner and act as Owner's <br /> representative as provided in the Construction Contract. The extent and limitations of the <br /> duties, responsibilities, and authority of Engineer as assigned in the Construction Contract <br /> shall not be modified, except as Engineer may otherwise agree in writing. All of Owner's <br /> instructions to Contractor will be issued through Engineer,which shall have authority to act <br /> on behalf of Owner in dealings with Contractor to the extent provided in this Agreement <br /> and the Construction Contract except as otherwise provided in writing. <br /> 2. Resident Project Representative.(RPR): DELETED <br /> 3. Selecting Independent Testing Laboratory: DELETED <br /> 4. Pre-Construction Conference: Participate in a Pre-Construction Conference prior to <br /> commencement of Work at the Site. <br /> 5. Schedules: DELETED <br /> 6. Baselines and Benchmarks: As appropriate, establish baselines and benchmarks for <br /> locating the Work which in Engineer's judgment are necessary to enable Contractor to <br /> proceed. <br /> 7. Visits to Site and Observation of Construction: In connection with observations of <br /> Contractor's Work while it is in progress: <br /> a. Make visits to the Site at intervals appropriate to the various stages of construction, as <br /> Engineer Owner deems necessary, to observe as an experienced and qualified design <br /> professional the progress of Contractor's executed Work. Such visits and observations <br /> by Engineer, and the Resident Project Representative, if any, are not intended to be <br /> exhaustive or to extend to every aspect of Contractor's Work in progress or to involve <br /> detailed inspections of Contractor's Work in progress beyond the responsibilities <br /> specifically assigned to Engineer in this Agreement and the Contract Documents, but <br /> rather are to be limited to spot checking, selective sampling, and similar methods of <br /> general observation of the Work based on Engineer's exercise of professional judgment, <br /> as assisted by the Resident Project Representative, if any. Based on information <br /> obtained during such visits and observations, Engineer will determine in general if the <br /> Page 4 <br /> (Exhibit A—Engineer's Services) <br /> EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br /> Copyright©2008 National Society of Professional Engineers for EJCDC. All rights reserved.— <br />
The URL can be used to link to this page
Your browser does not support the video tag.