Laserfiche WebLink
5. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: <br /> Geotechnical Investi'ation <br /> • 6. Furnish 3 review copies of the Preliminary Design Phase documents and any other <br /> deliverables to Owner within 30 calendar days of authorization to proceed with this phase, <br /> and review them with Owner. Within 5 calendar days of receipt, Owner shall submit to <br /> Engineer any comments regarding the Preliminary Design Phase documents and any other <br /> deliverables. <br /> 7. Revise the Preliminary Design Phase documents and any other deliverables in response to <br /> Owner's comments, as appropriate, and furnish to .Owner 3 copies of the revised <br /> Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br /> any other deliverables within 30 calendar days after receipt of Owner's comments. <br /> C. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br /> when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br /> Cost,and any other deliverables have been delivered to Owner. <br /> A1.03 Final Design Phase <br /> A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br /> probable Construction Cost as determined in the Preliminary Design Phase, and any other <br /> deliverables subject to any Owner-directed modifications or changes in the scope, extent, <br /> character,or design requirements of or for the Project,and upon written authorization from Owner, <br /> Engineer shall: <br /> 1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br /> Work to be performed and furnished by Contractor. <br /> 2. Provide technical criteria, written descriptions, and design data for Owner's use in filing <br /> applications for permits from or approvals of governmental authorities having jurisdiction <br /> to review or approve the final design of the Project; assist Owner in consultations with such <br /> authorities; and revise the Drawings and Specifications in response to directives from such <br /> authorities. <br /> 3. Advise Owner of any adjustments to the opinion of probable Construction Cost known to <br /> Engineer. <br /> 4. Perform or provide the following additional Final Design Phase tasks or deliverables: None <br /> 5. Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br /> advisors, and assist Owner in the preparation of other related documents. Within 5 days of <br /> receipt, Owner shall submit to Engineer any comments and, subject to the provisions of <br /> Paragraph 6.01.G,instructions for revisions. <br /> 6. Revise the bidding documents in accordance with comments and instructions from the <br /> Owner, as appropriate, and submit 3 final copies of the bidding documents, a revised <br /> Page 2 <br /> (Exhibit A—Engineer's Services) <br /> EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br /> Copyright©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />