Laserfiche WebLink
SUPPLEMENTAL AGREEMENT NO. 4 <br /> This Supplemental Agreement No. 4 is made and entered into this day of <br /> 2014, by and between the CITY OF SOUTH BEND, INDIANA, acting by and through the BOARD <br /> OF PUBLIC WORKS, hereinafter referred to as the "OWNER", and DLZ INDIANA, LLC, 2211 East <br /> Jefferson Boulevard, South Bend, Indiana 46615, hereinafter referred to as the "ENGINEER". <br /> WITNESSETH <br /> WHEREAS, the OWNER and ENGINEER did, on July 23, 2007 enter into an agreement for <br /> preparation of construction documents for certain street improvements along Michigan Street, <br /> Madison Street, Marion Street, Lafayette Street and Main Street, <br /> WHEREAS, the OWNER did, on April 12, 2010, enter into a Supplemental Agreement No. <br /> 1 for the improvements along Michigan Street, Madison Street, Navarre Street, Bartlett Street, <br /> Lafayette Street and a consolidated parking lot bounded by Michigan, Main, Madison and <br /> LaSalle Streets. <br /> WHEREAS, the OWNER did, on August 22, 2011, enter into a Supplemental Agreement <br /> No. 2 for the design of a consolidated parking lot bounded by Michigan, St. Joseph, Marion and <br /> Navarre Streets (Area 1), the design of a consolidated parking lot, Gateway Lot, bounded by <br /> Michigan, Main, Marion and Madison Streets (Area 2), and the design of a new entrance into <br /> the Memorial Hospital (Memorial Drive) and reconfiguration of the parking lot bounded by <br /> Michigan, Main, Bartlett Streets and Park Lane (Area 3). <br /> WHEREAS, the OWNER did, on June 11, 2013, enter into a Supplemental Agreement No. <br /> 3 for the design of additions and changes to the consolidated parking lot in Area 1 (Figure 3), <br /> building demolitions and the area that will be available after the demolition of the building <br /> located at 401 North Michigan Street will be added to the parking lot design (Figure 7). As a <br /> result of the coordination meetings held for the project, additional options were evaluated. <br /> WHEREAS, the OWNER has requested additional service and changes not included in <br /> the original contract or supplemental agreement, specifically the additions and changes to <br /> the consolidated parking lot in Area 3 (Figure 9). The building demolition has been requested <br /> to be made part of the agreement. The area that will be available after the demolition of the <br /> building will be added to the parking lot design (Figure 10). <br /> NOW THEREFORE, the OWNER and the ENGINEER desire to amend the above <br /> referenced Design Contract as follows: <br /> 1. Delete Section O. of Appendix "A" in its entirety. <br /> O. Not Used. <br /> 1 of 8 <br /> Supplemental Agreement No. 4 <br />