Laserfiche WebLink
i~ <br /> <br />C'ih of South B~axl, De~u~rnn cnl o! Comnnmitr c@ Cwnun~i~ I?`unnin,~ - 1~-:~'IT <br />7A'n rcnilx~r 3, _'OOb' <br />('uo~~ i q/ _d <br />additional H hours plus [or editing, review ~r~ith ('art, and final typing. ~'1'e submit a <br />Tixed fee of 521,000.00 (TF~~cuh~-one Thousand Dollars and 7,ero Cents) plus <br />reimbursable expenses billed at their cost times 1.2 (one and hi'o teutlu). <br />4. 13id~lrn~ -Once the documartation is con~ple[e, the City will advertise fo:~, receive and <br />tabulate bids for the project. ~1'he ~hroycr Group anticipates questions during the <br />bidding process along with potcariially sonic clarifications that ~r~ill recd to be issued <br />through addendum(s). The Troyer Group will review and recommend a successful <br />bidder to the City. A't'e propose doing this phase of the project at time and expense <br />(2.85 times our direct billable cost) plus reimbursable expenses (times 1.2) and <br />estimate that the cost ~~ould he X2,500 to $10,000. <br />5. Constr~~ctiai Adrninish~ation - We understand The Bureau of Public Construction will <br />handle all the construction administration with the exception oC rr~hat is required by the <br />Architect/Engineer for certification of the construction; our assumption is (hat the. <br />construction contract will also be handled by the Bureau. The lollor~-ing arc services <br />that need to be provided by The Troyer Group: <br />a. Shop drawuigs re~~ie~~~ Structural rebar, structural steel, the ciutr~iu tivall system. <br />mechanical equipment. electrical equipment. and misccllar,eous other shop <br />drawings will need to be reviewed by the certifying Archilcct~Hnginecr. ~~'e <br />propose doing this phase of the project at time and expense (3.85 times our <br />direct billable cosf) plus reimbursable expenses (times 1.2) and estimate tJ~at <br />the cost would be $8,000 to $12,000. <br />b. Consh'uction Observatio^ -The Architect of Record should mahe obsuvation <br />field visits as follows: Kick-off meeting, 1-? visits during Demo, I-2 visits as <br />curtain wall is installed, 1 for finish observation, and 1 for the final punch. "l~hc <br />St~zictural Engineer will need to visit as follor~-s: 2 visits during dcoro. ~~~hen rebar <br />fs installed, and 3 visits during steel erection. "I~he Mechanical }-;ngiueer needs to <br />visit during rough-in of equipment, above ceiling punch priur to ceiling installation, <br />and for final punch. "1'he Llccu~ical Engineer needs to visit after conduit rough-in <br />but prior to drywall installation, and hor the final review/punch. We propose d~~ing <br />this phase of the project at time and expense (2.85 times our direct billable <br />cost) plus reimbursable expenses (times 1.3) and estimate that the cost would <br />be $10,000 to $15,000. <br />c. Request for Information /Proposal Requests - It is unkno~~~n how much time will <br />be reyuircd for the RFI's J PR's. We assume the Bureau will handle the majority of <br />this wak, but the certifying Architect will need to knoe~~ what had been ahcred <br />from the original documentation. V~~e propose doing this phase of the project at <br />time and expense (2.85 times our direct billable cost) plus reimbursable <br />expenses (times l.3). <br />d. Certificate of Payment Review Since regularly scheduled obscrr-anon field visits <br />are not requested, die Certification of Pa_vmcnt will Head to be completed by the <br />Bureau of Public Construction. <br />