My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 Minutes 4/24/14 Meeting
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2014
>
05-15-15 Redevelopment Commission Meeting
>
2 Minutes 4/24/14 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 2:55:02 PM
Creation date
5/12/2014 2:54:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br /> Regular Meeting—April 24, 2014 <br /> 6. NEW BUSINESS (CONT.) <br /> C. Airport Economic Development Area <br /> (7) continued... <br /> Upon a motion by Ms. Schey, seconded by Mr. Downes and unanimously carried,the <br /> Commission accepted the proposal from Valbridge Property Advisors for appraisal of <br /> Blackthorn Golf Course for the scope of services and fee proposed. <br /> D. West Washington-Chapin Development Area <br /> There was no business in the West Washington-Chapin Development Area. <br /> E. South Side Development Area <br /> (1) Proposal for professional services (Engineering, High & Ireland) <br /> Mr. Relos noted that staff anticipates doing several moderate to small projects in the <br /> Ireland/Miami area. Staff solicited a proposal from Jones Petrie Rafinski (JPR)to complete <br /> necessary right of way(r/w) legal descriptions for improvements to the High& Ireland <br /> intersection,which services the Erskine Plaza Shopping Center. Improvements planned to <br /> this intersection are to add dedicated left turn lanes into and out of the Plaza. To do so,r/w <br /> is currently being acquired. <br /> To accommodate the business sign that is currently on the southwest corner,the planned <br /> permanent and temporary r/w needs to be shifted. By shifting the r/w the sign's setbacks <br /> will meet current zoning requirements; a variance would not have to be granted. <br /> Additionally,there is a drainage inlet at this corner, and a legal description for an easement <br /> to maintain the inlet is needed. As planned originally, the inlet was included in the <br /> permanent r/w. <br /> Staff requests approval of this professional services agreement in the amount of$750,to <br /> allow new legal descriptions to be prepared for the needed r/w and easement on this corner <br /> of the High& Ireland Improvement Project. <br /> Upon a motion by Ms. Schey, seconded by Mr. Downes and unanimously carried, the <br /> Commission accepted the proposal from Jones Petrie Rafinski for the scope of services and <br /> fee proposed. <br /> (2) Resolution No. 3212 approving and authorizing the execution of an Amendment to the <br /> Addendum to the Master Agency Agreement with the Board of Public Works. <br /> (Southside Improvements Project) <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.