My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 3212 approving and authorizing the execution of an Amendment to the Addendum to the Master Agency Agreement (South Side Improvements Project)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 3212 approving and authorizing the execution of an Amendment to the Addendum to the Master Agency Agreement (South Side Improvements Project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2014 3:26:45 PM
Creation date
4/28/2014 12:34:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C• <br />B � <br />Christopher B. Burke Engineering, LLC <br />220 W. Colfax Ave. Suite 500 South Bend, IN 46601 574.282.8001 cbbel- in.com <br />April 16,2014 RECEIVED APR 21 1014 <br />David Relos <br />City of South Bend <br />Department of Community Investment <br />14th Floor County-City Building <br />South Bend, IN 46601 <br />Subject: Southside Project Improvements - Amendment II <br />Professional Services Proposal <br />Dear Mr. Relos: <br />In accordance with our contract, and per the directions you provided during our phone <br />conversation on April 14th, 2014, we are notifying you of a change in the scope of our project <br />which results in additional work that was not included in the original contract scope of work. The <br />scope changes and additional work are described below: <br />1. Assist with the right of way acquisition process that included exhibit preparation and <br />coordination with DLZ. Update Bowen Avenue sidewalk project based on comments <br />received during right of way acquisition and update bid documents. <br />2. Assist with the right of way acquisition process that included exhibit preparation and <br />coordination with DLZ. Update Miami Avenue and Ireland Road sidewalk project based <br />on comments received during right of way acquisition and the update of the bid <br />documents. <br />3. Assist with the right of way acquisition process that included exhibit preparation and <br />coordination with DLZ. Update the High Street and Ireland Road intersection project <br />documents and grading based on the comments received during right of way acquisition. <br />The design of the sign relocation will be completed by a sign design consultant <br />contracted separately by the city. CBBEL will incorporate the sign relocation design into <br />the overall bid documents. <br />4. Update the design to remove the berm around the Erskine Retention Basin and replace it <br />with a wooden guard rail. Changes to the design based on new information provided by <br />the Division of Engineering. The plans will use the latest aerial as provided by the city GIS <br />(no additional survey services are included). Incorporate plans and specifications into the <br />overall south side improvement project bid documents. <br />Additional Estimated Fee: $8,100.00 <br />We believe this extra work is justified and necessary for a complete design. In summary, an <br />amendment to the current contract is requested that will require an additional $8,100.00 in order <br />to complete additional work not included in the original scope of work. This amendment is <br />subject to the general terms and conditions included in the original contract. <br />City of South Bend Southside Project Improvements- Amendment II April 16, 2014 <br />19.R700167.00001 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.