Laserfiche WebLink
ORDINANCE NO. ~ ~ S ~O <br />AN ORDINANCE OF THE COMMON COUNCIL OF THE CITY OF SOUTH BEND, <br />INDIANA TO EXTEND AND PROVIDE UTILITY SERVICES TO AN AREA WITHIN <br />THE MUNICIPAL CITY LIMITS IN PORTAGE TOWNSHIP KNOWN AS A PORTION <br />OF THE JACKSON SUBDIVISION,. BORDERING ON HUEY STREET, AND ON <br />HAMILTON STREET,'IN SOUTH BEND, INDIANA <br />STATEMENT OF PURPOSE AND INTENT <br />Presently, certain isolated portions of the City of South Bend do not have City water and/or <br />sewer services due to lack of availability of sewer and/or water lines. This includes a segment of <br />Huey Street encompassing fourteen (14) separate parcels of real estate (approximately nine (9) <br />households), and a segment ofHamilton Street encompassing two separate parcels ofreal estate (one <br />(1) household. <br />When sewer and water services were provided to other City dwellers in the past, the <br />benefitted property owners assumed a significant portion of the costs of the necessary construction <br />through Barrett law assessments which have since been paid off, or by payment in a lump sum at the <br />time vacant real estate was developed. <br />The City now desires to extend utility service lines to an affected area in the Jackson <br />Subdivision (unrecorded) consisting of a tract of land on Huey Street, specifically Lots 81, 82, 83, <br />the North half of 84, the South half of 84, 85, 86, the East half of 89, the East half of 90, 91, 92, the <br />Southeast half of 93, the Northeast half of 93, and 94; and also including a tract of land on Hamilton <br />Street, specifically a portion of Lot 56, Jackson Subdivision. The City further desires to provide for <br />the cost and method of paying for such utility extension construction pursuant to the City's general <br />authority under I.C. 36-9-23-1 et seq. and specifically I.C. 36-9-23-10. <br />The cost of installing the sewer main to the affected properties located on Hamilton Street, <br />Huey Street, and Bergan Street in South Bend, Indiana is around $208,850 as estimated by, the <br />engineer selected by the Board of Public Works for the sewer extension portion of the project whose <br />plans and specifications were approved by the Board of Public Works, and the cost of the water line <br />extension portion of the prof ect is roughly $29,325. However, the water extension is the completion <br />of a prior project for which the residents have already paid. <br />The City desires to charge each property owner in the affected area the sum of $3,000 for <br />each such owner's share of the sewer line extension, which cost is roughly equivalent to the current <br />cost of installing a private septic system (excluding service line connection costs), and the City will <br />assume and pay the balance of the construction costs for sewer and water extension. All of the <br />owners of the affected real estate have been notified generally and informally of the City's intent, <br />cost estimates, and of the owners' expected cost sharing. <br />