Laserfiche WebLink
REGULAR MEETING <br />_APRIL 8, 2014 120 <br />2 <br />Liner, CIPP, 10 inch <br />8621 LFT <br />$ 37.50 <br />$323,287.50 <br />3 <br />Liner, CIPP, 12 inch <br />1303 LFT <br />$ 44.50 <br />$ 57,983.00 <br />4 <br />Liner, CIPP, 15 inch <br />890 LFT <br />$ 49,00 <br />$ 43,610.00 <br />5 <br />Liner, CIPP, 18 inch <br />612 LFT <br />$ 73.00 <br />$ 44,676.00 <br />6 <br />Liner, CIPP, 24 inch <br />I00 LFT <br />$ 150,00 <br />$ 15,000.00 <br />7 <br />Liner, CIPP, 36 inch <br />I00 LFT <br />$ 200.00 <br />$ 20,000.00 <br />8 <br />Reconnect Service, Remote Cut <br />238 Each <br />$ 75.00 <br />$ 17,850.00 <br />9 <br />Work Allowance <br />1 LSum <br />$50,000.00 <br />$ 50,000.00 <br />TOTAL BASE BID <br />$584,692.00 <br />Upon a motion made by Mr. Gilot, seconded by Ms. Roos and carried, the above bids were <br />referred to the Sewer and Street Departments for review and recommendation. <br />OPENING OF BIDS — ONE OR MORE, 2014 OR NEWER, HEAVY DUTY 16.500 LB. <br />GVWR CHASSIS (STREETS CAPITAL LEASE) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />JORDAN MOTORS, INC. <br />609 E. Jefferson Blvd. <br />Mishawaka, IN 46545 <br />Bid was signed by: Debra Starkweather, National Fleet Sales Manager <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Local preference claim was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />C <br />Description <br />Year/Make/Model <br />Unit Price <br />Chassis Cab <br />2015 Ford F450 4x2, V 10 Gas, Auto <br />$29,984.00 each <br />Option# <br />Description <br />Cost <br />Total <br />1 <br />Four wheel drive. <br />$ <br />$32,514.00 each <br />2 <br />Front mounted 8'2" Boss Power — V or <br />$ <br />$ 5,745.00 each <br />equal. Plow to come equipped with <br />safety approved lights, markers, snow <br />deflector, and shoes. <br />3 <br />Duel fuel conversion. Gasoline/CNG <br />$ <br />$18,900.00 each <br />conversion with state of the art <br />components and minimum 20 GGE <br />tanks. <br />Upon a motion made by Ms. Roos, seconded by Mr. Relos and carried, the above bids were <br />referred to the Street Department and Central Services for review and recommendation. <br />OPENING OF BIDS — THREE MORE OR LESS 2014 OR NEWER MID -SIZE FOUR - <br />DOOR SEDAN AUTOMOBILES ENGINEERING AND BUILDING DEPARTMENT <br />CAPITAL LEASE AND WATER WORKS CAPITAL <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />