Laserfiche WebLink
C Christopher B. Burke Engineering, LLC <br /> BB 220 W.Colfax Ave. Suite 500 South Bend,IN 46601 574.282.8001 cbbel-in.com <br /> April 16,2014 RECEIVED APR 21 2014 <br /> David Relos <br /> City of South Bend <br /> Department of Community Investment <br /> 14th Floor County-City Building <br /> South Bend, IN 46601 <br /> Subject: Southside Project Improvements-Amendment II <br /> Professional Services Proposal <br /> Dear Mr. Relos: <br /> In accordance with our contract, and per the directions you provided during our phone <br /> conversation on April 14th, 2014, we are notifying you of a change in the scope of our project <br /> which results in additional work that was not included in the original contract scope of work. The <br /> scope changes and additional work are described below: <br /> 1. Assist with the right of way acquisition process that included exhibit preparation and <br /> coordination with DLZ. Update Bowen Avenue sidewalk project based on comments <br /> received during right of way acquisition and update bid documents. <br /> 2. Assist with the right of way acquisition process that included exhibit preparation and <br /> coordination with DLZ. Update Miami Avenue and Ireland Road sidewalk project based <br /> on comments received during right of way acquisition and the update of the bid <br /> documents. <br /> 3. Assist with the right of way acquisition process that included exhibit preparation and <br /> coordination with DLZ. Update the High Street and Ireland Road intersection project <br /> documents and grading based on the comments received during right of way acquisition. <br /> The design of the sign relocation will be completed by a sign design consultant <br /> contracted separately by the city. CBBEL will incorporate the sign relocation design into <br /> the overall bid documents. <br /> 4. Update the design to remove the berm around the Erskine Retention Basin and replace it <br /> with a wooden guard rail. Changes to the design based on new information provided by <br /> the Division of Engineering. The plans will use the latest aerial as provided by the city GIS <br /> (no additional survey services are included). Incorporate plans and specifications into the <br /> overall south side improvement project bid documents. <br /> Additional Estimated Fee: $8,100.00 <br /> We believe this extra work is justified and necessary for a complete design. In summary, an <br /> amendment to the current contract is requested that will require an additional $8,100.00 in order <br /> to complete additional work not included in the original scope of work. This amendment is <br /> subject to the general terms and conditions included in the original contract. <br /> City of South Bend Southside Project Improvements-Amendment II April 16,2014 <br /> 19.R100167.00001 Page 1 <br />