My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/11/2014 Board of Public Works
sbend
>
Public
>
Public Works
>
Minutes
>
2014
>
03/11/2014 Board of Public Works
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:07:17 PM
Creation date
4/1/2014 10:47:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/11/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />MARCH 11, 2014 74 <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Security Check was submitted. <br />D <br />Description <br />Year/Make/Model <br />Unit Price <br />Reg Cab 4x2 Pick Up <br />2014 or Newer Ford F250 4x2 <br />$22,528.62 <br />Option# <br />Description <br />Cost <br />Total <br />I <br />Install 8' service body Knapheide <br />$ 5,449.00 <br />$5,449.00 ea. <br />Model 700 or equal with sprayed in <br />bedliner including over the top of box. <br />2 <br />Dual fuel conversion. Gasoline/CNG <br />$11,015.00 <br />$11,015.00 ea. <br />conversion with state of the art <br />components and minimum 20 G.G.E. <br />Tanks. 21.2 G.G.E. <br />O'DANIEL MOTOR SALES INC. <br />5611 Illinois Road <br />Ft. Wayne, IN 46804 <br />Bid was signed by: Nick Buchanan <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was not submitted. <br />Indiana Local Business Preference Claim was submitted. <br />Description <br />Year/Make/Model <br />Unit Price <br />4x2 Truck <br />2014 2500 Reg Cab Long Bed <br />$22 488 <br />Option# <br />Description <br />Cost <br />Total <br />1 <br />Install 8' service body Knapheide <br />$ 5,348.00 <br />$27,936 <br />Model 700 or equal with sprayed in <br />bedliner including over the top of box. <br />2 <br />Dual fuel conversion. Gasoline/CNG <br />N/A <br />N/A <br />conversion with state of the art <br />components and minimum 20 G.G.E. <br />Tanks. <br />- 5 yr/100K Rust Protection <br />MICHIGAN CITY CHRYSLER DODGE JEEP RAM <br />700 E U. S. Hwy 20 <br />Michigan City, IN 46360 <br />Bid was signed by: Tom Crane <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />Indiana Local Business Preference Claim submitted. <br />Description <br />Year/Make/Model <br />Unit Price <br />2WD Pick Up <br />2014 Ram 2500 Regular Cab <br />$23,300.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.