Laserfiche WebLink
REGULAR MEETING <br />MARCH 11 2014 78 <br />2 <br />Front mounted 8'2" Boss Power —V or <br />$5,587.00 <br />$30,158.00 <br />2015 Ford F250 4X4, 137WB Pickup <br />equal. Plow to come equipped with <br />$5,071.00 <br />$5,071.00 <br />safety approved lights, markers, and <br />snow deflector and shoes. <br />3 <br />Install 8' service body Knapheide <br />$6,309.00 <br />$30,880.00 <br />Model 700 or equal with sprayed in bed <br />2 <br />liner including over the top of box. <br />$5,737.00 <br />$5,737.00 <br />4 <br />Dual fuel conversion. Gasoline /CNG <br />$ 13,927.00 <br />$38,498.00 <br />conversion with state of the art <br />components and minimum 20 G.G.E. <br />tanks. <br />BLOOMINGTON FORD, INC. <br />2200 S. Walnut Street <br />Bloomington, IN 47401 <br />Bid was signed by: Sam Roberts <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non - Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10 %) Bid Bond was submitted. <br />we <br />Description <br />Year /Make/Model <br />Unit Price <br />3/4 -Ton 4X4 Pickup <br />2015 Ford F250 4X4, 137WB Pickup <br />$24,794.62 <br />Option# <br />Description <br />Cost <br />Total <br />1 <br />Plow Package: Front mounted western <br />$5,071.00 <br />$5,071.00 <br />8' pro -plus or equal power angling left <br />and right. Plow to come equipped with <br />safety approved lights and markers, <br />and snow deflector. <br />2 <br />Front mounted 8'2" Boss Power —V or <br />$5,737.00 <br />$5,737.00 <br />equal. Plow to come equipped with <br />safety approved lights, markers, and <br />snow deflector and shoes. <br />Western MVP plus V -Plows <br />3 <br />Install 8' service body Knapheide <br />$5,449.00 <br />$5,449.00 <br />Model 700 or equal with sprayed in bed <br />liner including over the top of box. <br />4* <br />Dual fuel conversion. Gasoline /CNG <br />$ 11,015.00 <br />$ 11,015.00 <br />conversion with state of the an <br />components and minimum 20 G.G.E. <br />tanks. 21.2 CTGE <br />Bi -ruei Reg. /C;N(j Conversion <br />Upon a motion made by Ms. Roos, seconded by Mr. Relos and carried, the above bids were <br />referred to Central Services for review and recommendation. <br />OPENING OF BIDS — 2014 -2015 WATER AND WASTEWATER TREATMENT <br />CHEMICALS SEWAGE OPERATIONS AND MAINTENANCE. OPERATIONS <br />This was the date set for receiving and opening of sealed bids for the above referenced materials. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. Ms. Greene stated that due to the number of <br />items being bid on, she would read only the names of those submitting bids into the record and <br />the staff reviewing the bids would confirm that all of the required documents were submitted <br />with each bid. She noted a bid tabulation sheet would be posted on the City website after review <br />and tabulation. The following bids were opened and the names of the bidders publicly read: <br />