Laserfiche WebLink
REGULAR MEETING FEBRUARY 25 2014 43 <br />Item <br />No <br />Item <br />Quantity <br />Unit <br />Unit Price <br />PART A — ASPHALT MATERIALS — NO BIDS <br />HMA Surface l 1 Steel Slag HP <br />1,800 <br />Ton <br />NO BID <br />Manhole Cover & Frame <br />HMA Binder 8/9 <br />500 <br />Ton <br />NO BID <br />Catch Basin Cover & Frame <br />HMA Binder 8/9 MAC <br />500 <br />Ton <br />NO BID <br />MH Riser 20 3/4" D — 1 "R — 718 "L <br />HMA Binder 11 <br />6,300 <br />Ton <br />NO BID <br />MH Riser 20 3/4" D — 1 1/2 "R — 7/8 "L <br />HMA Binder 11 MAC <br />2,000 <br />Ton <br />NO BID <br />HMA Base 5D <br />1,000 <br />Ton <br />NO BID <br />CMA Patch HP <br />750 <br />Ton <br />NO BID <br />CMA Patch AE -300P <br />500 <br />Ton <br />NO BID <br />AE -T Tack <br />75,000 <br />Gal <br />$2.30 <br />AE -90S Crack Seal <br />5,000 <br />Gal <br />$2.40 <br />MAC 20 Crack Seal <br />2,500 <br />Gal <br />$2.80 <br />RS -2 <br />15,000 <br />Gal <br />$2.05 <br />Polymer Modified Asphalt Emulsion <br />15,000 <br />Gal <br />$2.40 <br />Dust Control Agent <br />140,000 <br />Gal <br />$1.45 <br />Polymer Modified Asphalt Cement MAC HD <br />15,000 <br />Gal <br />$3.00 <br />PART B — PCC MATERIALS — NO BIDS <br />PART C — AGGREGATE MATERIALS — NO BIDS <br />PART D — SEWER MATERIALS — NO BIDS <br />PART E — TRAFFIC MATERIALS — NO BIDS <br />PART F — SNOW REMOVAL MATERIALS — NO BIDS <br />UNDERGROUND PIPE & VALVE INC. <br />1077 Oliver Plow Ct. <br />South Bend, Indiana 46601 <br />Bid was signed by: Donald E. Nuner <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non - Discrimination Commitment for <br />Contractors and Certification of Use of United States Steel Products or Foundry Products was <br />submitted. <br />Indiana Local Business Preference Claim Form was submitted. <br />Ten (10 %) Bid Bond was submitted. <br />—F Item <br />No. <br />Item <br />Quantity <br />Unit <br />Unit Price <br />PART A — ASPHALT MATERIALS — NO BIDS <br />PART B — PCC MATERIALS — NO BIDS <br />PART C — AGGREGATE MATERIALS — NO BIDS <br />PART D — SEWER MATERIALS <br />Manhole Cover & Frame <br />300 <br />Each <br />$188.00 <br />Catch Basin Cover & Frame <br />300 <br />Each <br />$163.00 <br />MH Riser 20 3/4" D — 1 "R — 718 "L <br />60 <br />Each <br />$115.00 <br />MH Riser 20 3/4" D — 1 1/2 "R — 7/8 "L <br />90 <br />Each <br />$120.00 <br />