My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2014
>
02-27-14 Redevelopment Commission Meeting
>
6C(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 1:04:19 PM
Creation date
2/24/2014 12:47:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Chris Dressel <br />February 10, 2014 <br />Page 2 of 4 <br />four PCB transformer rooms for limited site characterization purposes (Task 1 of <br />original contract) to determine if remediation maybe necessary (completed in May 2013) <br />and (2) various services associated with transformer removal (completed in December <br />2013). <br />• Additional bid specification preparation (Task 2 of the original contract) and project <br />management (Task 4 of original contract) activities associated with asbestos and lead - <br />based paint abatement. Weaver Boos originally anticipated that these services in the <br />original contract would be completed within eight weeks with one complete set of <br />environmental bid specifications for the project. The specifications would encompass all <br />of the environmental components combined (asbestos, transformers, lead -based paint, <br />etc.). However, due to reasons beyond the control of Weaver Boos, bid specifications <br />applicable to each specific environmental component have been prepared and multiple <br />versions have been requested for the PCB transformer removal (two completed versions <br />in July and August 2013), asbestos abatement (two completed versions in August and <br />November 2013), and lead -based paint abatement (one completed version in August <br />2013 with one revised version for one half of the building complex to be completed by <br />March 2014 and a third version for the second half of the building to be completed a <br />couple months later.). <br />• Additional project management time (Task 4) associated with meetings both at SBRC <br />offices and on -site, multiple pre -bid meetings, and additional inspections of the building. <br />As part of the original contract, Weaver Boos understood that the USTC would have a <br />plan regarding the proposed renovation of the building complex. However, a final plan <br />is not yet been made available to Weaver Boos which is partly the reason multiple <br />versions of the environmental specifications have been prepared and additional <br />inspections of the building have been required (principally to determine what may or is <br />being removed for renovation and what is not). <br />
The URL can be used to link to this page
Your browser does not support the video tag.