My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(3)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2014
>
02-27-14 Redevelopment Commission Meeting
>
6B(3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 1:04:06 PM
Creation date
2/24/2014 12:47:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WN <br />ARCHITECTS <br />February 20, 2014 <br />Mr. David Relos <br />Economic Resources <br />City of South Bend <br />Department of Community Investment <br />1316 County-City Building <br />South Bend, IN 46601 <br />RE: PROPOSAL FOR ARCHITECT'S SERVICES <br />for the <br />ST. JOSEPH / WAYNE STREET PARKING STRUCTURE <br />South Bend, Indiana <br />Dear David: <br />We thank you for this opportunity to submit to you our Proposal to provide architectural and <br />engineering consultant services to the City of South Bend (Owner) for the Exterior Facade <br />Renovation to the St. Joseph /Wayne Street Parking Structure. Alliance Architects (Architect) <br />shall provide Services as listed herein. <br />PROJECT UNDERSTANDING <br />The Project Site is located at the northwest corner of St. Joseph Street and Wayne Street in <br />downtown South Bend. <br />The City, in addition to the desired exterior aesthetic improvements, requires a long -term <br />solution to the on -going deterioration of the existing precast brick veneer system. Alternative <br />methods of repair and /or replacement of the existing facade system have been submitted to the <br />City by Carl Walker, Inc. (Facade Study dated January 23, 2013). The Architect will retain the <br />consulting services of Carl Walker, Inc. <br />The City will consider a phased project delivery approach to the renovation in order to eliminate <br />the concerns of public safety (ie. Phase -1: Encapsulate or remove the deteriorating precast <br />brick veneer facade system; Phase -2: Design and installation of new facade). <br />The Project Budget is $650,000. <br />ARCHITECT SCOPE OF SERVICES <br />1. PROJECT ADMINISTRATION <br />a. The Architect shall manage the Architect's services and administer the Project. The <br />Architect shall consult with designated representatives from the City of South Bend to <br />929 Lincolnway East, Suite 200 1 South Bend, Indiana 46601 1 Tel 574.288.2052 1 Fax 574.288.2550 1 www.alliarch.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.